A battery installation of 8.2 MW and 33 MWh in Fregenal de la Sierra, Badajoz, in public consultation. Every fact below is taken from the latest act in the regional gazette of Extremadura that states it, and every act is linked.

In the gazette

Battery power8.2 MW
Storage33 MWh
Hours at full power4.0
PromoterErg Solar Fregenal de la Sierra, SL
ConfigurationAdded to a plant
Plant it is added toPS Fregenal de la Sierra, solar
MunicipalityFregenal de la Sierra
ProvinceBadajoz
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
11 Sep 2026Public consultation; 8.2 MW, 33 MWhCONSEJERÍA DE INDUSTRIA, ENERGÍA, CIENCIA Y TERRITORIODOE-26081495

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Extremadura, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.