Vitreous LabsEnergy transparency

HIB Alconchel 2020

A battery installation of 9.8 MW and 19.6 MWh in Alconchel, Badajoz, first authorisation. Every fact below is taken from the latest act in the regional gazette of Extremadura that states it, and every act is linked.

In the gazette

Battery power9.8 MW
Storage19.6 MWh
Hours at full power2.0
PromoterAlter Enersun Alconchel, SL
ConfigurationAdded to a plant
Plant it is added toAlconchel 2020, solar
MunicipalityAlconchel
ProvinceBadajoz
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Jul 2025Public consultation; 9.8 MW, 19.6 MWhCONSEJERÍA DE AGRICULTURA, GANADERÍA Y DESARROLLO SOSTENIBLEDOE-25081192
16 Jun 2026First authorisation (autorización administrativa previa); 9.8 MW, 19.6 MWhCONSEJERÍA DE INDUSTRIA, ENERGÍA, CIENCIA Y TERRITORIODOE-26061509

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Extremadura, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map