HIB Ellomay Solar

A battery installation of 9.9 MW in Talaván, Cáceres, first authorisation. Every fact below is taken from the latest act in the regional gazette of Extremadura that states it, and every act is linked.

In the gazette

Battery power9.9 MW
PromoterEllomay Solar SLU
ConfigurationAdded to a plant
Plant it is added toEllomay Solar, solar
MunicipalityTalaván
ProvinceCáceres
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
19 Dec 2025Public consultation; 9.9 MWCONSEJERÍA DE AGRICULTURA, GANADERÍA Y DESARROLLO SOSTENIBLEDOE-25082051
15 Apr 2026First authorisation (autorización administrativa previa); 9.9 MWCONSEJERÍA DE AGRICULTURA, GANADERÍA Y DESARROLLO SOSTENIBLEDOE-26060790

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Extremadura, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.