Hibridación acumulación de 9.6 MWh con FV Los Vallitos

A battery installation in Adeje, Santa Cruz de Tenerife, authorised to build. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery powernot stated in any act
Storage9.6 MWh
PromoterSan Eugenio, S.A.
ConfigurationAdded to a plant
Plant it is added toFV Los Vallitos, solar
MunicipalityAdeje
ProvinceSanta Cruz de Tenerife
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
15 May 2026Environmental decision; 9.6 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2026-093-1610
20 Jul 2026Authorisation to build (autorización administrativa de construcción); 9.6 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2026-144-2570
23 Sep 2026First authorisation (autorización administrativa previa); 9.6 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2026-191-3317

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.