Vitreous LabsEnergy transparency

Instalación de almacenamiento de baterías n.º 1 Nurel

A battery installation of 3 MW and 5 MWh in Zaragoza, Zaragoza, in public consultation. Every fact below is taken from the latest act in the regional gazette of Aragón that states it, and every act is linked.

In the gazette

Battery power3 MW
Storage5 MWh
Hours at full power1.6
PromoterNurel SA
ConfigurationAdded to a plant
Plant it is added toPlantas de autoconsumo fotovoltaico sin excedentes Nurel I y Nurel II, solar (self-consumption)
MunicipalityZaragoza
ProvinceZaragoza
SubstationSET Nurel
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
15 Dec 2023Public consultation; 3 MW, 5 MWhVICEPRESIDENCIA SEGUNDA DEL GOBIERNO Y DEPARTAMENTO DE ECONOMÍA, EMPLEO E INDUSTRIABOA-007937725

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Aragón, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map