Vitreous LabsEnergy transparency

Instalación híbrida Los Monteros (módulo de almacenamiento)

A battery installation of 2.4 MW and 4.8 MWh in Pedrola, Zaragoza, authorised to build. Every fact below is taken from the latest act in the regional gazette of Aragón that states it, and every act is linked.

In the gazette

Battery power2.4 MW
Storage4.8 MWh
Hours at full power2.0
PromoterMolinos del Ebro, SA
ConfigurationAdded to a plant
Plant it is added toInstalación híbrida Los Monteros (wind 25,5 MW + PV 22 MW), wind + solar
MunicipalityPedrola
ProvinceZaragoza
SubstationSET Bayo 220/20 kV (shared)
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
3 Jul 2023Public consultationDEPARTAMENTO DE AGRICULTURA, GANADERÍA Y MEDIO AMBIENTEBOA-007934255
16 Sep 2024Public consultation; 2.4 MW, 4.8 MWhVICEPRESIDENCIA DEL GOBIERNO Y DEPARTAMENTO DE PRESIDENCIA, ECONOMÍA Y JUSTICIABOA-007943627
3 Oct 2024Environmental decision; 2.4 MW, 4.8 MWhDEPARTAMENTO DE MEDIO AMBIENTE Y TURISMOBOA-007944065
4 Jun 2025Authorisation to build (autorización administrativa de construcción); 2.4 MW, 4.8 MWhVICEPRESIDENCIA DEL GOBIERNO Y DEPARTAMENTO DE PRESIDENCIA, ECONOMÍA Y JUSTICIABOA-007949678

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Aragón, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map