Vitreous LabsEnergy transparency

Marzagán 1

A battery installation of 15 MW and 60.4 MWh in Telde, Las Palmas, in public consultation. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery power15 MW
Storage60.4 MWh
Hours at full power4.0
PromoterIberdrola Renovables Canarias, S.A.U.
ConfigurationStand-alone
MunicipalityTelde
ProvinceLas Palmas
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Jul 2025Public consultation; 15 MW, 60.4 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2025-142-2647

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map