PSF Las Norias (hybrid PV and storage)

A battery installation of 2.5 MW and 5.2 MWh in Mérida, Badajoz, in public consultation. Every fact below is taken from the latest act in the regional gazette of Extremadura that states it, and every act is linked.

In the gazette

Battery power2.5 MW
Storage5.2 MWh
Hours at full power2.1
PromoterExplotaciones Porcinas El Berrocal, SL
ConfigurationAdded to a plant
Plant it is added toPSF Las Norias, solar
MunicipalityMérida
ProvinceBadajoz
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
19 Jan 2026Public consultation; 2.5 MW, 5.2 MWhCONSEJERÍA DE AGRICULTURA, GANADERÍA Y DESARROLLO SOSTENIBLEDOE-26080042

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Extremadura, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.