Vitreous LabsEnergy transparency

Storage at Agrupación Maira Delta

A battery installation of 48.5 MW in Burgos, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power48.5 MW
ConfigurationAdded to a plant
Plant it is added toAgrupación Maira Delta, 115 MW
ProvinceBurgos
SubstationDe Barcina 400 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
9 Nov 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 48.5 MW·BOE-A-2026-23496*

The acts marked with an asterisk have so far been read only by our parser, which can mistake a plant’s power for the battery’s; the full reading, with every figure checked against the act’s words, follows within a week. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map