Unnamed storage (BOE-B-2026-36301)

A battery installation of 30 MW and 120 MWh in Fuentestrún, Soria, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power30 MW
Storage120 MWh
Hours at full power4.0
ConfigurationAdded to a plant
MunicipalityFuentestrún
ProvinceSoria
SubstationTrévago 220 kV
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
6 Nov 2026Public consultation; 30 MW, 120 MWh·BOE-B-2026-36301*

The acts marked with an asterisk have so far been read only by our parser, which can mistake a plant’s power for the battery’s; the full reading, with every figure checked against the act’s words, follows within a week. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.