Vitreous LabsEnergy transparency

NWJ MET Orgères II

A battery of 1.24 MW and 2.43 MWh in Orgères, on Enedis’s distribution grid, in service since 1 September 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service1 September 2026
CommuneOrgères, Ille-et-Vilaine, Bretagne
NetworkEnedis, HTA
Substation it connects throughMorihan (MORIH)
Placed on the mapat the distribution substation it connects through (Morihan), from Caparéseau
EIC code17W000002523651F

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 30 September 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map