A battery of 1.2 MW and 1.2 MWh in Albert, on Enedis’s distribution grid, in service since 24 September 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.2 MW
Energy1.2 MWh
Hours at full power1.0
Charging power1.2 MW
In service24 September 2026
CommuneAlbert, Somme, Hauts-de-France
NetworkEnedis, HTA
Substation it connects throughAlbert (ALBE5)
Placed on the mapat the distribution substation it connects through (Albert), from Caparéseau
EIC code17W000002524452G

The company

This battery is filed under the name of a company, SOLROI (SIREN 878978881), registered 15 November 2019 with its seat in Puteaux. The company register lists its officers as:

The company register as read by recherche-entreprises.api.gouv.fr on 10 November 2026, Licence Ouverte. Officers are not owners: a company’s president is usually its parent company, but the register of shareholders is not public.

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.