A battery of 1.2 MW and 1.2 MWh in Albert, on Enedis’s distribution grid, in service since 24 September 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 1.2 MW |
| Energy | 1.2 MWh |
| Hours at full power | 1.0 |
| Charging power | 1.2 MW |
| In service | 24 September 2026 |
| Commune | Albert, Somme, Hauts-de-France |
| Network | Enedis, HTA |
| Substation it connects through | Albert (ALBE5) |
| Placed on the map | at the distribution substation it connects through (Albert), from Caparéseau |
| EIC code | 17W000002524452G |
The company
This battery is filed under the name of a company, SOLROI (SIREN 878978881), registered 15 November 2019 with its seat in Puteaux. The company register lists its officers as:
- GREENYELLOW, Président de SAS (SIREN 501657399)
- KPMG SA, Commissaire aux comptes titulaire (SIREN 775726417)
The company register as read by recherche-entreprises.api.gouv.fr on 10 November 2026, Licence Ouverte. Officers are not owners: a company’s president is usually its parent company, but the register of shareholders is not public.
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 30 September 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.