Burwell Weirs Drove BESS
50 MW in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.
What it is
| Registered power | 50 MW balancing mechanism registration |
| Charging zone | Mid Wales and The Midlands |
| Postcode | CB25 |
| Balancing mechanism unit | E_BURWB-1 |
Who owns it and who trades it
| Traded by | Arenko Cleantech Limitedruns several sitesconfirmed, Elexon's register |
| Owned by | not published anywhere we can read |
| Ultimately | Voltwise Power (Sandbrook Capital) confirmed source |
How we know. The register names no owner. The capacity market holds a site called BURWB1 belonging to Voltwise Power Holdings Limited, which is this unit's own balancing code, and Burwell Weirs Drove is a two phase Voltwise site of about 126 MW operated by Ethical Power.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 11 November 2026 |
|---|---|
| Balancing mechanism | £2k |
| Response and reserve auctions auction implied | £0 |
| Capacity market | no agreement we can attach |
| Three lines together | £2k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism
No estimate for this registration. The battery sells under a newer code now, and anything estimated for it belongs on that page, so it is not counted twice. Method
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. How long this battery can run for is not published, so duration is not used to choose them. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Grendon | 50 | 2h | £97.9/kW/yr |
| Creyke Beck | 50 | not known | £68.6/kW/yr |
| Sundon BESS | 50 | 2h | £65.9/kW/yr |
| Pivot Power Coventry | 50 | 2h | £54.8/kW/yr |
| Chapel Farm BESS | 50 | 1.5h | £36.9/kW/yr |
| Burwell Weirs Drove BESSthis battery | 50 | not known | £0.0/kW/yr |
In its distribution register
The distribution register of UK Power Networks also lists (ANM) Weirs Drove 2, 30 MW, accepted to connect on 27 August 2020 and not yet connected, at the same site: an extension or a later phase. Matched on a site word in common, 1 km apart.
See it on the Development Atlas
From each operator’s embedded capacity register, read every Monday. How the registers are linked to the units that trade.
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.
Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.