Capenhurst
57 MW, about 154 MWh (2.7 hours, published by Constantine Energy Storage) in North Midlands and North Wales. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.
What it is
| Registered power | 57 MW balancing mechanism registration |
| Storage duration | 2.7 hours published by Constantine Energy Storage |
| Charging zone | North Midlands and North Wales |
| Connection site | Capenhurst 275kV |
| Postcode | CH66 2HJ |
| Balancing mechanism unit | T_CAPNB-1 |
Where the duration comes from. Constantine Energy Storage, which owns the battery, announced in February 2025 that its five 57 MW batteries (Ocker Hill, Whitegate, Monk Fryston, Capenhurst and Legacy) are 2.7 hour systems, about 154 MWh each, with Habitat Energy trading the first three and EDF the other two (Solar Power Portal, 17 February 2025, solarpowerportal.co.uk). Sungrow, which supplied the batteries, gave Ocker Hill and Capenhurst as 57 MW and 165 MWh each in March 2023, before they were built, about 2.9 hours (sungrowpower.com). This page takes the later and lower figure. Until 25 October 2026 it gave 2 hours, the capacity market class, which is the duration an agreement was bid in. This battery had not yet begun declaring its stored energy to NESO on 25 October 2026. Zenobe's separate 100 MW battery at Capenhurst is a different project. Every megawatt hour figure on this site for this battery is worked from 2.7 hours.
Who owns it and who trades it
| Traded by | HD888CAP Ltdconfirmed, Elexon's register |
| Owned by | HD888CAP LIMITED |
| Owner established from | capacity market registered holder |
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 11 November 2026 |
|---|---|
| Balancing mechanism | £444k |
| Response and reserve auctions auction implied | £184k |
| Capacity market | £849k |
| Three lines together | £1.5m |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held no frequency response contract in the window, so the whole position is treated as traded. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 24,106 MWh |
| Metered import, what crossed the meter in | 29,275 MWh |
| Equivalent full cycles, everything sent out over one full charge | 157 over 358 days, 160 a year at that rate |
| Apparent meter to meter efficiency | 82%, plausible: losses plus a standing load that is material against a modest throughput |
| Balancing offers accepted | 17,678 MWh |
| Balancing bids accepted | 16,427 MWh |
| Position outside balancing, export | 23,540 MWh |
| Position outside balancing, import | 29,961 MWh |
| Valued at the market index, sold | £3.2m |
| Valued at the market index, bought | £2.5m |
| Outside balancing, net, at the index | £737k |
| Balancing and outside balancing together | £1.3m £23.92/kW/yr |
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £137.73 a megawatt hour at that same index, 1.32 times the average. What it took in was worth £83.62, 0.80 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 16,427 MWh of accepted bids it paid an average of £94.16 a megawatt hour. The market index averaged £124.09 across those same half hours, so it bought back at £29.93 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| below zero | 543 MWh | −£23.38 | £13k received |
| £0 to £25 | 986 MWh | £12.16 | £12k |
| £25 to £50 | 777 MWh | £38.71 | £30k |
| £50 to £75 | 2,543 MWh | £66.47 | £169k |
| £75 to £100 | 5,303 MWh | £86.65 | £459k |
| above £100 | 6,274 MWh | £141.66 | £889k |
On 543 MWh the price was below zero: NESO paid this unit an average of £23.38 a megawatt hour to take energy, £13k in all. That is a constrained network with more generation on it than it can move.
The other direction, offers, is much smaller here: 17,678 MWh where NESO asked for more, paid at an average of £121.45 against an index of £89.95.
Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.
Where it stands
| Balancing incomewhole fleet, £/kW/yr | 68th percentile103 units | |
| Balancing incomeEngland and Wales peer group | 55th percentile75 units | |
| Balancing income2.7 hour duration cohort | 60th percentile11 units | |
| All three measured lineswhole fleet, £/kW/yr | 66th percentile234 units | |
| Energy sent outhours at full power | 71st percentile101 units | |
| Energy taken inhours at full power | 56th percentile101 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Ocker Hill | 58 | 2.7h | £57.4/kW/yr |
| Hyde | 37 | 2.5h | £47.6/kW/yr |
| Sizing John | 57 | 2.5h | £33.7/kW/yr |
| Monk Fryston | 57 | 2.7h | £33.5/kW/yr |
| Capenhurstthis battery | 57 | 2.7h | £26.0/kW/yr |
| Thame Road BESS | 50 | 2.4h | £9.3/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.
Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.