Great Britain · the operating fleet

Enderby Storage

45 MW, about 90 MWh (2 hours, from the capacity market de-rating class) in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 6 November 2026, or is labelled as an estimate.

What it is

Registered power45 MW response and reserve auction registration
Storage duration2 hours capacity market de-rating class
Charging zoneMid Wales and The Midlands
Connection siteBlaby
PostcodeLE19 4AD
Balancing mechanism unit2__BCMRO002 a supplier unit registered by the company that trades it; its balancing actions are not yet counted on this site

Who owns it and who trades it

Traded byBGI Trading Limitedruns several sitesconfirmed, Elexon's register
Owned byENDERBY STORAGE LIMITED
Owner established fromcapacity market registered holder
UltimatelyGresham House Energy Storage Fund confirmed source

How we know. Statera's Enderby page names Gresham House Energy Storage Fund plc as project owner, with Statera as developer, EPC and O&M.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

Until 28 July 2025 this battery sold as BFSE01 under F & S Energy Ltd. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.

Until 24 November 2025 this battery sold as BFSE1 under Arenko Cleantech Limited, taking £131k inside this page's year. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.

What it is built from

Battery systemSungrow (original units), augmented with 16 CATL units on Sungrow PCS
Power conversionSungrow
Engineering and constructionStatera Energy Projects (EPC); J&B Hopkins, augmentation
Entered operationoperational 2022

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed for Enderby Storage; this page is the Enderby unit as the fleet maps it. Checked 2026-10-06. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.

What it earned

Line364 days to 6 November 2026
Balancing mechanismnot yet counted
Response and reserve auctions auction implied£559k
Capacity market£636k
Three lines together£1.2m

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 5,191 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 9 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 189 days to 1 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out16,314 MWh
Metered import, what crossed the meter in19,154 MWh
Equivalent full cycles, everything sent out over one full charge181 over 189 days, 350 a year at that rate
Apparent meter to meter efficiency85%, an ordinary battery: round trip losses alone
Balancing offers accepted0 MWh
Balancing bids accepted0 MWh
Position outside balancing, export16,314 MWh
Position outside balancing, import19,154 MWh
Of which expected response delivery, net−1,861 MWh 1,376 out, 3,237 in
Traded position, net−980 MWh 17,076 out, 18,056 in
Traded position at the market index, sold£2.4m
Traded position at the market index, bought£2.0m
Traded position, net, at the index£420k
Response delivery, net, at the imbalance price−£267k −£239k at the index
Balancing and outside balancing together£153k £6.57/kW/yr

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £119.36. What it sent out was worth £138.96 a megawatt hour at that same index, 1.16 times the average. What it took in was worth £108.17, 0.91 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.

  • only 189 of 364 days metered

Where it stands

All three measured lineswhole fleet, £/kW/yr36th percentile234 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Melksham East492h£142.1/kW/yr
SSE Salisbury492h£57.8/kW/yr
Titchfield Lane472h£47.4/kW/yr
Cowley491.5h£30.6/kW/yr
Enderby Storagethis battery452h£26.6/kW/yr
West Didsbury452h£14.7/kW/yr

In its distribution register

The distribution register of National Grid Electricity Distribution lists this site as Desford road bess, 52 MW, connected on 26 November 2022. Matched on the same owner, 0 km apart.

See it on the Development Atlas

From each operator’s embedded capacity register, read every Monday. How the registers are linked to the units that trade.

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.

Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.