Kiwi Es B
3 MW in South Wales and Gloucester. Everything on this page is read from published data for the 364 days to 27 September 2026, or is labelled as an estimate.
What it is
| Registered power | 3 MW response and reserve auction registration |
| Charging zone | South Wales and Gloucester |
| Connection site | Bridgend |
| Postcode | CF33 4RS |
| Balancing mechanism unit | none found under the codes we search |
Who owns it and who trades it
| Traded by | GORE STREET ENERGY TRADING LIMITEDruns several sitesauction results, unchecked |
| Owned by | KIWI POWER ES B LIMITED |
| Owner established from | capacity market registered holder |
| Ultimately | Gore Street Energy Storage Fund confirmed source |
How we know. The capacity market holds a Bridgend site called KPB002, which reads as Kiwi Power Battery, belonging to Gore Street Energy Storage Fund plc 420 metres away. The second unit at the same postcode carries no owner and is read across.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. This unit is registered only in the response and reserve auctions, so the seller is the participant NESO's auction results name, and Elexon's register carries no entry to check it against. How we tell them apart
Until 26 February 2025 this battery sold as ANSC-012 under ANESCO LIMITED. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.
What it earned
| Line | 364 days to 27 September 2026 |
|---|---|
| Balancing mechanism | not published |
| Response and reserve auctions auction implied | £232k |
| Capacity market | £16k |
| Three lines together | £249k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism
Elexon publishes no metered output for this registration, an auction unit rather than a balancing mechanism unit, so nothing outside the balancing mechanism can be derived for it. We give it no estimate either. It was paid £77.65 per kilowatt a year in the response and reserve auctions, which means it spends most of its time held in those services rather than trading. The 4 batteries with a published meter that were paid £60 or more per kilowatt a year in the auctions made between −£15.34 and −£2.16 per kilowatt a year outside them, balancing included: they buy power only to cover their losses while they are held. Borrowing a figure from batteries that trade would overstate this one. Method
Where it stands
| All three measured lineswhole fleet, £/kW/yr | 88th percentile229 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. How long this battery can run for is not published, so duration is not used to choose them. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Kiwi Es Bthis battery | 3 | not known | £83.1/kW/yr |
| Eondc-01 | 4 | not known | £26.5/kW/yr |
| Gridbeyond | 3 | 2h | £22.7/kW/yr |
| Central Bedfordshire | 3 | not known | £8.4/kW/yr |
| South Hams | 2 | not known | £8.3/kW/yr |
| Huntingdonshire | 3 | not known | £0.0/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.