Mnor-01
36 MW in North Midlands and North Wales. Everything on this page is read from published data for the 364 days to 27 September 2026, or is labelled as an estimate.
What it is
| Registered power | 36 MW response and reserve auction registration |
| Charging zone | North Midlands and North Wales |
| Connection site | Barnsley |
| Postcode | S71 1HT |
| Balancing mechanism unit | none found under the codes we search |
Who owns it and who trades it
| Traded by | EQUINICITY LTDruns several sitesauction results, unchecked |
| Owned by | not published anywhere we can read |
| Ultimately | Gresham House Energy Storage Fund confirmed source |
How we know. The register names no owner. The capacity market holds Stairfoot 1 belonging to Gresham House Energy Storage Fund plc 70 metres away, and Stairfoot Generation Ltd is already confirmed to the fund.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. This unit is registered only in the response and reserve auctions, so the seller is the participant NESO's auction results name, and Elexon's register carries no entry to check it against. How we tell them apart
What it earned
| Line | 364 days to 27 September 2026 |
|---|---|
| Balancing mechanism | not published |
| Response and reserve auctions auction implied | £0 |
| Capacity market | no agreement we can attach |
| Three lines together | £0 |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism
No estimate for this registration. The battery sells under a newer code now, and anything estimated for it belongs on that page, so it is not counted twice. Method
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. How long this battery can run for is not published, so duration is not used to choose them. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Maldon | 36 | 1h | £101.4/kW/yr |
| Port of Tyne Energy Storage | 35 | 0.7h | £62.2/kW/yr |
| Fareham Reserve 2 | 36 | 1h | £37.6/kW/yr |
| Contego Battery | 36 | 2h | £24.8/kW/yr |
| Conrad (FLITWICK) | 36 | 1h | £16.9/kW/yr |
| Mnor-01this battery | 36 | not known | £0.0/kW/yr |
Why every line reads zero
This registration has never appeared with an award or an acceptance in any market we read. That is the whole public record.
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.