10 MW, about 20 MWh (2 hours, from the capacity market de-rating class) in Essex and Kent. Everything on this page is read from published data for the 364 days to 27 September 2026, or is labelled as an estimate.

What it is

Registered power10 MW response and reserve auction registration
Storage duration2 hours capacity market de-rating class
Charging zoneEssex and Kent
Connection siteBasildon
PostcodeSS14 3JH
Balancing mechanism unitnone found under the codes we search

Who owns it and who trades it

Traded byARENKO CLEANTECH LIMITEDruns several sitesauction results, unchecked
Owned byNEVENDON ENERGY STORAGE LTD
Owner established fromcapacity market registered holder
UltimatelyGresham House Energy Storage Fund confirmed source

How we know. The fund announced buying Port of Tyne and Nevendon on 1 February 2021.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. This unit is registered only in the response and reserve auctions, so the seller is the participant NESO's auction results name, and Elexon's register carries no entry to check it against. How we tell them apart

What it is built from

Entered operation2018 (commissioned for Enhanced Frequency Response)

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed. Checked 2026-08-31. source 1. Fields not shown are not published anywhere we have found, and we do not guess them.

What it earned

Line364 days to 27 September 2026
Balancing mechanismnot published
Response and reserve auctions auction implied£0
Capacity market£132k
Three lines together£132k

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, estimated from metered peers

Elexon publishes no metered output for this registration, an auction unit rather than a balancing mechanism unit, so nothing can be derived for it. What can be said is what its peers did: 40 units of about 2 hours in England and Wales, metered, earned between £5.65 and £39.89 per kilowatt a year with the balancing legs and the position outside the balancing mechanism together, £29.62 at the median. Applied to this unit's 10 MW that is £296k, in a range of £56k to £399k. An estimate from other batteries, never this one's figure. Method

Where it stands

All three measured lineswhole fleet, £/kW/yr25th percentile229 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Zenobe Brindley122h£134.3/kW/yr
Taylor Road121.5h£36.7/kW/yr
Broadditch Battery112h£32.7/kW/yr
Woburn Road102h£28.9/kW/yr
Nevendonthis battery102h£13.2/kW/yr
Ecotricity (SMART GRID)92h£9.3/kW/yr

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.