Vitreous LabsEnergy transparency

Richborough Energy Park

One physical site, registered with the market as 2 balancing units, 100 MW in Essex and Kent. The market settles each unit on its own; this page adds them back up. Everything is read from published data for the 364 days to 27 September 2026.

The site

Registered power, live units100 MW
Balancing units2
Charging zoneEssex and Kent
Owned byRICHBOROUGH ENERGY PARK LIMITED
UltimatelySosteneo (Pacific Green developed) confirmed
Traded byLimejump Energy Limited

What the site earned, all units together

Line364 days to 27 September 2026
Balancing mechanism, paid to discharge£1.3m
Balancing mechanism, paid out to charge−£571k
Response and reserve auctions£2.4m
Capacity market£243k
Three measured lines together£3.4m

Income per kilowatt across the whole site: £39.58/kW/yr on the three measured lines, before charging costs and before wholesale trading, which nobody publishes. Each unit's own page carries its estimate and its percentiles.

The units

UnitMWDischargeChargeStanding readyCM
T_RICHB-1
Limejump Energy Limited
50£683k−£288k£1.2m—
T_RICHB-2
Limejump Energy Limited
50£578k−£283k£1.3m£243k

What it is built from

Battery systemGotion (LFP)
Entered operation2024-01 (grid connection announced)
Connection voltage132 kV documented: 132 kV point of interconnection per the Pacific Green case study

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed. Checked 2026-08-30. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.

Grouped on evidence, not on a name: shared unit code stem RICHB, all 2 units within 0.1 km. Portfolio families that share a code stem across distant sites, such as an aggregator's fleet, are never grouped. Methods

All batteries