West Burton B Battery

One physical site, registered with the market as 2 balancing units, 62 MW in North Midlands and North Wales. The market settles each unit on its own; this page adds them back up. Everything is read from published data for the 364 days to 27 September 2026.

The site

Registered power, live units62 MW
Balancing units2
Charging zoneNorth Midlands and North Wales
Owned byWEST BURTON B LIMITED
UltimatelyUK Transition Power confirmed
Traded byWest Burton B Limited

What the site earned, all units together

Line364 days to 27 September 2026
Balancing mechanism, paid to discharge£193k
Balancing mechanism, paid out to charge−£196k
Response and reserve auctions£0
Capacity market£1.4m
Three measured lines together£1.4m

Income per kilowatt across the whole site: £26.38/kW/yr on the three measured lines, before charging costs and before wholesale trading, which nobody publishes. Each unit's own page carries its estimate and its percentiles.

The units

UnitMWDischargeChargeStanding readyCM
T_WBURB-41
West Burton B Limited
31£85k−£97k——
T_WBURB-43
West Burton B Limited
31£107k−£99k—£1.4m

What it is built from

Battery systemNidec (2018 EFR generation)
Engineering and constructionNidec ASI with EDF Energy Renewables
Entered operation2018
Container count20 containers at 2.45 MW each

From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed (2018 build); probable (pipeline ties). Checked 2026-08-30. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.

Grouped on evidence, not on a name: shared unit code stem WBURB, all 2 units within 0.1 km. Portfolio families that share a code stem across distant sites, such as an aggregator's fleet, are never grouped. Methods