Wormald Green BESS
33 MW, about 66 MWh (2 hours, published by Harmony Energy Income Trust) in South Lancashire, Yorkshire and Humber. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.
What it is
| Power | 33 MW published by its owner; Elexon registers 40 MW |
| Storage duration | 2 hours published by Harmony Energy Income Trust |
| Charging zone | South Lancashire, Yorkshire and Humber |
| Connection site | Wormald Green |
| Balancing mechanism unit | 2__FBPGM001 |
The power on this page comes from the owner. Harmony Energy Income Trust, which owned the battery when it was built, announced it on 12 September 2024 as 33 MW and 66 MWh, a two hour system. The capacity market and planning records also give 33 MW. Elexon registers the unit at 40 MW. Northern Powergrid's register probably shows the same battery, as Wormald Green Hybrid: 32.5 MW, connected on 18 September 2024, on a connection that allows 43 MW out and 33.2 MVA in, shared with a solar farm not yet built. Harmony Energy, which manages the battery, confirmed on 6 November 2026 that nothing has changed at the site: 33 MW and 66 MWh remain correct and its export has stayed within 33 MW throughout 2026. Elexon's figures for the unit show more than that from April 2026: up to 36.7 MW sent out, and on 12 June 74.3 MWh in one discharge. Harmony Energy explained why. For a battery on a distribution network, the volume Elexon publishes is the site's meter multiplied by the network operator's line loss factor for that half hour. Northern Powergrid moved Wormald Green from its general factors to factors of its own on 1 April 2026, and those reach 1.106 on power sent out. Elexon's data fits that account. Since April the highest half hours sit at two levels, 35.7 MW and 36.6 MW, which are 33 MW multiplied by 1.08 and 1.11. Over the same months the energy sent out rose from 86% to 94% of the energy taken in, more than any battery returns. So the megawatts, megawatt hours, cycles and efficiency read from Elexon's meter figures on this page are up to a tenth above what crossed the site's own meter since April. The money figures stand, because settlement pays on the same adjusted volumes. With thanks to Harmony Energy for the explanation. Every per kilowatt figure on this site is worked from 33 MW. Read the announcement.
Where the duration comes from. Harmony Energy Income Trust announced Wormald Green on 12 September 2024 as 33 MW and 66 MWh, a two hour system. Every megawatt hour figure on this site for this battery is worked from 2 hours.
Who owns it and who trades it
| Traded by | BP Gas Marketing Limitedruns several sitesconfirmed, Elexon's register |
| Owned by | HEIT WG LIMITED |
| Owner established from | capacity market registered holder |
| Ultimately | Harmony Energy Income Trust (assets under Foresight Group) probable source |
How we know. The HEIT SPV naming; the trust sold its assets to Foresight.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it is built from
| Battery system | Envision Energy, two hour liquid cooled |
| Entered operation | 2024-09 (energisation announced 12 September 2024) |
From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed. Checked 2026-08-30. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.
What it earned
| Line | 364 days to 11 November 2026 |
|---|---|
| Balancing mechanism | £1.0m |
| Response and reserve auctions auction implied | £698k |
| Capacity market | £205k |
| Three lines together | £1.9m |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 7,564 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 14 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 32,766 MWh |
| Metered import, what crossed the meter in | 35,867 MWh |
| Equivalent full cycles, everything sent out over one full charge | 496 over 358 days, 506 a year at that rate |
| Apparent meter to meter efficiency | 91%, more than a battery returns: on a distribution network Elexon's volumes carry the network operator's loss factor, which can lift what is sent out against what is taken in |
| Balancing offers accepted | 24,180 MWh |
| Balancing bids accepted | 18,483 MWh |
| Position outside balancing, export | 32,978 MWh |
| Position outside balancing, import | 41,775 MWh |
| Of which expected response delivery, net | −1,489 MWh 3,203 out, 4,692 in |
| Traded position, net | −7,309 MWh 32,171 out, 39,480 in |
| Traded position at the market index, sold | £4.3m |
| Traded position at the market index, bought | £3.4m |
| Traded position, net, at the index | £910k |
| Response delivery, net, at the imbalance price | −£201k −£172k at the index |
| Balancing and outside balancing together | £1.8m £56.69/kW/yr |
This battery connects to a distribution network. For such a unit the volumes Elexon publishes are settlement volumes: the site's own meter multiplied by the network operator's line loss factor for that half hour. The factor is usually within a few per cent of one, so the megawatt hours, cycles and efficiency above can sit a little above or below what crossed the site's meter. The money is settled on the same adjusted volumes. Method and caveats
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £133.14 a megawatt hour at that same index, 1.27 times the average. What it took in was worth £85.44, 0.82 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 18,483 MWh of accepted bids it paid an average of £96.08 a megawatt hour. The market index averaged £130.09 across those same half hours, so it bought back at £34.01 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| below zero | 626 MWh | −£13.47 | £8k received |
| £0 to £25 | 627 MWh | £12.66 | £8k |
| £25 to £50 | 1,081 MWh | £39.29 | £42k |
| £50 to £75 | 2,801 MWh | £64.83 | £182k |
| £75 to £100 | 5,067 MWh | £87.68 | £444k |
| above £100 | 8,280 MWh | £133.81 | £1.1m |
On 626 MWh the price was below zero: NESO paid this unit an average of £13.47 a megawatt hour to take energy, £8k in all. That is a constrained network with more generation on it than it can move.
The other direction, offers, is much smaller here: 24,180 MWh where NESO asked for more, paid at an average of £119.98 against an index of £88.08.
Physical checks passed on power: the meter never exceeded the registered power by more than fifteen per cent. The year's exports against imports are higher than a battery returns, which the loss factor in the note above explains.
Where it stands
| Balancing incomewhole fleet, £/kW/yr | 97th percentile103 units | |
| Balancing incomeEngland and Wales peer group | 96th percentile75 units | |
| Balancing income2.0 hour duration cohort | 97th percentile63 units | |
| All three measured lineswhole fleet, £/kW/yr | 96th percentile234 units | |
| Energy sent outhours at full power | 94th percentile101 units | |
| Energy taken inhours at full power | 75th percentile101 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Welkin Mill | 35 | 2h | £117.3/kW/yr |
| Wormald Green BESSthis battery | 33 | 2h | £58.8/kW/yr |
| Rusholme | 35 | 1.5h | £27.4/kW/yr |
| Atherton | 30 | 2.5h | £26.2/kW/yr |
| Contego Battery | 36 | 2h | £22.8/kW/yr |
| North Tawton BESS | 32 | 2h | £13.9/kW/yr |
In its distribution register
The distribution register of Northern Powergrid lists this site as Wormald Green Hybrid, 32 MW, connected on 18 September 2024. Matched on a site word in common, 2 km apart.
See it on the Development Atlas
From each operator’s embedded capacity register, read every Monday. How the registers are linked to the units that trade.
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.
Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.