Norway · the named batteries
Fossum solkraftverk batteri
Consented, 4 MW and 4.6 MWh, in Skien, owned by Fossum Sol 1 AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.
The battery
| Power | 4 MW |
| Capacity | 4.6 MWh |
| Duration | 1.1 hours |
| What the sources say about the size | Two systems of 2 MW / 2.3 MWh each. |
| Kind | Hybrid with a solar plant |
| Status | Consented, as of 2 September 2025 |
| Consented | 19 December 2024 |
| Municipality | Skien, Telemark |
| Bidding zone | NO2, the south west (Kristiansand, Stavanger); read from its county |
| Placed on the map | GeoNames, Fossum (Skien) |
| NVE case | 16111, NVE reference 202306795 |
Who is behind it
| Owner | Fossum Sol 1 AS |
| Brønnøysund number | 931120220 |
What the sources say
NVE says this 8 MWp solar plant was the first to be given a concession for batteries. The Ministry of Energy rejected an appeal on 2 September 2025.
The papers on NVE’s case, newest first
- 02.09.2025 Energidepartementets avgjørelse - klage på vedtak om konsesjon til Fossum solkraftverk (Konsesjon)
- 12.02.2025 Oversendelse av klage på vedtak (Konsesjon)
- 10.01.2025 Klage på NVEs vedtak.pdf (Konsesjon)
- 2024.12.19 Bakgrunn for vedtak Fossum solkraftverk (Konsesjon)
- 2024.12.19 Kart over planområde (Konsesjon)
- 2024.12.19 Anleggskonsesjon Fossum solkraftverk (Konsesjon)
- 2024.12.19 Oversendelsesbrev konsesjon (Konsesjon)
- 2024.12.02 Konsekvensutredning naturtyper.pdf (Konsesjon)
- 2024.12.02 - Konsekvensutredning klimagassutslipp.pdf (Konsesjon)
- 2023.06.09 Konsesjonssøknad Fossum solkraftverk.pdf (Konsesjon)
- 2023.06.09 Kart anlegg.pdf (Konsesjon)
- 2023.06.09 Konsekvensutredning.pdf (Konsesjon)
As NVE lists them on the case page, read every day; NVE’s document number rises with time. 12 papers in all.
Evidence and sources
- NVE concession of 19 December 2024: webfileservice.nve.no/API/PublishedFiles/Download/b4a418fa-70ed-4…
- Ministry of Energy decision on the appeal (upheld): webfileservice.nve.no/API/PublishedFiles/Download/7e653b31-8f57-4…
Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B16.