Mørre kraftverk battery

Consented, 2.5 MW and 1.98 MWh, in Åfjord, owned by TrønderEnergi Kraft AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.

The battery

Power2.5 MW
Capacity1.98 MWh
Duration0.8 hours
What the sources say about the size2.5 MVA in the concession; 1.98 MWh in the application
KindHybrid with a hydro plant
StatusConsented, as of 30 September 2024
Consented30 September 2024
Stated date2025, expected
What it is forFCR-N
MunicipalityÅfjord, Trøndelag
Bidding zoneNO3, the middle (Trondheim); read from its county
Placed on the mapGeoNames, Åfjord municipality
NVE case20448, NVE reference 202408801

Who is behind it

OwnerTrønderEnergi Kraft AS
Brønnøysund number878631072
GroupAneo AS
Built or supplied bySiemens Energy (Aneo release)

What the sources say

A battery container in a tunnel at the Mørre hydro plant, to sell FCR-N with the plant. The application planned it in service early in 2025. No word since that it runs.

The papers on NVE’s case, newest first

As NVE lists them on the case page, read every day; NVE’s document number rises with time. 11 papers in all.

Evidence and sources

Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B08.