Ren Røros industribatteri (Røros Syd Energipark)

Being built, 4.9 MW and 12.2 MWh, in Røros, owned by Ren Røros AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.

The battery

Power4.9 MW
Capacity12.2 MWh
Duration2.5 hours
KindIndustrial and grid backup
StatusBeing built, as of 3 February 2026
Stated dateOctober 2026, expected
What it is forbackup power for industry, voltage support, arbitrage and the reserve markets
MunicipalityRøros, Trøndelag
Bidding zoneNO3, the middle (Trondheim); read from its county
Placed on the mapGeoNames, Røros

Who is behind it

OwnerRen Røros AS
Brønnøysund number915591302
Built or supplied byTGN Energy with Hitachi Energy

What the sources say

Ren Røros's board decided on about NOK 60 million in February 2026; the owner says the battery is the largest of its kind in Norway and is to start in October 2026, at the 130th anniversary of the Kuråsfossen plant. A company, Ren Røros Batteri AS (937147910), was registered for it on 12 February 2026. No word yet that it runs.

Evidence and sources

Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B07.