Solgrid Furuseth BESS
Consented, 5 MW and 13.5 MWh, in Stor-Elvdal, owned by Solgrid Furuseth AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.
The battery
| Power | 5 MW |
| Capacity | 13.5 MWh |
| Duration | 2.7 hours |
| What the sources say about the size | The owner's application: three containers of 4.5 MWh and 2.2 MW, 5 MW / 13.5 MWh in all. NVE's permit letter reads it as 2.2 MW / 4.5 MWh, which is one container. |
| Kind | Hybrid with a solar plant |
| Status | Consented, as of 5 June 2025 |
| Consented | 5 June 2025 |
| Stated date | Q1 2026, expected |
| What it is for | FCR-N first |
| Municipality | Stor-Elvdal, Innlandet |
| Bidding zone | NO1, the south east (Oslo); read from its county |
| Placed on the map | GeoNames, Stor-Elvdal municipality |
| NVE case | 7618, NVE reference 202116320 |
Who is behind it
| Owner | Solgrid Furuseth AS |
| Group | Solgrid AS (924462779) |
| Built or supplied by | Huawei (named as the likely supplier) |
What the sources say
Beside the 7 MWp Furuseth solar plant, Norway's first large solar park. The owner aimed to be running by the end of Q1 2026; no word since that it runs. The application says Solgrid Furuseth AS will own it; no company of that exact name is in the Brønnøysund register (searched 25 October 2026), while the solar plant's concession holder, Furuseth Solkraftverk AS, is (929485238).
The papers on NVE’s case, newest first
- Søknad om endring av varighet på konsesjon - Furuseth solkraftverk (Konsesjon)
- Anleggskonsesjon for Furuseth solkraftverk (Konsesjon)
- Konsesjonskart 20.05.2025 (Konsesjon)
- Solgrid Furuseth AS - Tillatelse til etablering av batterianlegg (Konsesjon)
- 20250522 Endringssøknad BESS Solgrid Furuseth (Konsesjon)
- 2023.08.22 - Inspeksjonsrapport - byggefase - Furuseth solkraftverk. (Konsesjon)
- 2023.07.12 - Godkjenning av endret detaljplan - Furuseth solkraftverk (Konsesjon)
- 2022.10.07 - Detaljplan Furuseth solkraftverk (Konsesjon)
- 2022.05.05c - Bakgrunn for vedtak (Konsesjon)
- 2021.10.21 - Konsesjonssøknad for Furuseth solkraftverk (Konsesjon)
As NVE lists them on the case page, read every day; NVE’s document number rises with time. 10 papers in all.
Evidence and sources
- NVE permit of 5 June 2025: webfileservice.nve.no/API/PublishedFiles/Download/710eb7b9-99c5-4…
- Owner's application of 22 May 2025: webfileservice.nve.no/API/PublishedFiles/Download/eb950257-bae6-4…
Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B15.