Vitreous LabsEnergy transparency

Solgrid Furuseth BESS

Consented, 5 MW and 13.5 MWh, in Stor-Elvdal, owned by Solgrid Furuseth AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.

The battery

Power5 MW
Capacity13.5 MWh
Duration2.7 hours
What the sources say about the sizeThe owner's application: three containers of 4.5 MWh and 2.2 MW, 5 MW / 13.5 MWh in all. NVE's permit letter reads it as 2.2 MW / 4.5 MWh, which is one container.
KindHybrid with a solar plant
StatusConsented, as of 5 June 2025
Consented5 June 2025
Stated dateQ1 2026, expected
What it is forFCR-N first
MunicipalityStor-Elvdal, Innlandet
Bidding zoneNO1, the south east (Oslo); read from its county
Placed on the mapGeoNames, Stor-Elvdal municipality
NVE case7618, NVE reference 202116320

Who is behind it

OwnerSolgrid Furuseth AS
GroupSolgrid AS (924462779)
Built or supplied byHuawei (named as the likely supplier)

What the sources say

Beside the 7 MWp Furuseth solar plant, Norway's first large solar park. The owner aimed to be running by the end of Q1 2026; no word since that it runs. The application says Solgrid Furuseth AS will own it; no company of that exact name is in the Brønnøysund register (searched 25 October 2026), while the solar plant's concession holder, Furuseth Solkraftverk AS, is (929485238).

The papers on NVE’s case, newest first

As NVE lists them on the case page, read every day; NVE’s document number rises with time. 10 papers in all.

Evidence and sources

Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B15.

All batteries  ·  On the map