Norway · the named batteries
Solvind Åsen vindpark batteri
Announced, 1 MW and 2.33 MWh, in Time, owned by Gnist Energi AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.
The battery
| Power | 1 MW |
| Capacity | 2.33 MWh |
| Duration | 2.3 hours |
| What the sources say about the size | Battery leased from Eidsiva Vekst's Peak Shaper. |
| Kind | Hybrid with a wind farm |
| Status | Announced, as of 13 November 2025 |
| Stated date | H1 2026, expected |
| Municipality | Time, Rogaland |
| Bidding zone | NO2, the south west (Kristiansand, Stavanger); read from its county |
| Placed on the map | GeoNames, Time municipality |
Who is behind it
| Owner | Gnist Energi AS |
| Brønnøysund number | 934409078 |
| Built or supplied by | Peak Shaper (Eidsiva Vekst) |
What the sources say
Behind a 1.6 MW wind farm (NVE: Åsen II, Solvind Åsen AS). Planned for the first half of 2026; no word since that it runs.
Evidence and sources
- Eidsiva press release: kommunikasjon.ntb.no/pressemelding/18720181/betydelig-merverdi-i…
Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B21.