Norway · the named batteries
Steinsheia sol- og batteripark
Notified to NVE, 10 MW and 20 MWh, in Lyngdal, owned by Solkraft Sør AS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gives.
The battery
| Power | 10 MW |
| Capacity | 20 MWh |
| Duration | 2.0 hours |
| Kind | Hybrid with a solar plant |
| Status | Notified to NVE, as of 19 October 2026 |
| Municipality | Lyngdal, Agder |
| Bidding zone | NO2, the south west (Kristiansand, Stavanger); read from its county |
| Placed on the map | GeoNames, Lyngdal municipality |
| NVE case | 26249, NVE reference 202617178 |
Who is behind it
| Owner | Solkraft Sør AS |
| Brønnøysund number | 927774658 |
What the sources say
A 10.5 MWac solar plant with a 10 MW / 20 MWh battery. A project company, Steinsheia Sol- og Batteripark AS (836357612), was registered on 15 October 2025.
The papers on NVE’s case, newest first
- Høring av melding med forslag til utredningsprogram (Konsesjon)
- Melding med forslag til utredningsprogram (Konsesjon)
As NVE lists them on the case page, read every day; NVE’s document number rises with time. 2 papers in all.
Evidence and sources
- Notification (10 MW / 20 MWh): webfileservice.nve.no/API/PublishedFiles/Download/891b0dac-fe79-4…
- NVE case 26249 (on consultation): nve.no/konsesjon/konsesjonssaker/konsesjonssak
Statnett publishes no meter, price or instruction per battery, so this page carries no money; what one megawatt would be paid in each reserve market is on the markets page. List id NO-B20.