East Cambridgeshire
24 MW, about 72 MWh (3 hours, measured from its behaviour) in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 27 September 2026, or is labelled as an estimate.
What it is
| Registered power | 24 MW balancing mechanism registration |
| Storage duration | 3 hours measured from twenty one days of behaviour |
| Charging zone | Mid Wales and The Midlands |
| Connection site | East Cambridgeshire |
| Postcode | CB250BP |
| Balancing mechanism unit | E_BURWB-3 |
Who owns it and who trades it
| Traded by | EDF ENERGY CUSTOMERS LIMITEDruns several sitesconfirmed, Elexon's register |
| Owned by | not published anywhere we can read |
| Ultimately | Voltwise Power (Sandbrook Capital) confirmed source |
How we know. The register names no owner. The capacity market holds a site called BURWB1 belonging to Voltwise Power Holdings Limited, which is this unit's own balancing code, and Burwell Weirs Drove is a two phase Voltwise site of about 126 MW operated by Ethical Power.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 27 September 2026 |
|---|---|
| Balancing mechanism | £0 |
| Response and reserve auctions auction implied | £204k |
| Capacity market | no agreement we can attach |
| Three lines together | £204k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 4,280 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 6 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 103 days to 12 September 2026, 33 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 5,419 MWh |
| Metered import, what crossed the meter in | 6,261 MWh |
| Equivalent full cycles, everything sent out over one full charge | 75.3 over 103 days, 267 a year at that rate |
| Apparent meter to meter efficiency | 87%, an ordinary battery: round trip losses alone |
| Balancing offers accepted | 0 MWh |
| Balancing bids accepted | 0 MWh |
| Position outside balancing, export | 5,419 MWh |
| Position outside balancing, import | 6,261 MWh |
| Of which expected response delivery, net | −1,752 MWh 1,320 out, 3,072 in |
| Traded position, net | 911 MWh 5,582 out, 4,671 in |
| Traded position at the market index, sold | £770k |
| Traded position at the market index, bought | £360k |
| Traded position, net, at the index | £410k |
| Response delivery, net, at the imbalance price | −£216k −£200k at the index |
| Balancing and outside balancing together | £194k £28.61/kW/yr |
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £112.37. What it sent out was worth £137.92 a megawatt hour at that same index, 1.23 times the average. What it took in was worth £77.08, 0.69 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- only 103 of 364 days metered
- the meter exceeded the 24.0 MW registration on 26 days between 2026-06-05 and 2026-09-08, peaking at 30 MW export and 30 MW import: more than this battery can do, so another asset on the same meter, a commissioning period, or a settlement run error
Where it stands
| All three measured lineswhole fleet, £/kW/yr | 19th percentile229 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Hyde | 37 | 2.5h | £31.7/kW/yr |
| Whitebirk BESS | 25 | 2.9h | £30.9/kW/yr |
| West Bradford | 29 | 2.5h | £29.4/kW/yr |
| Atherton | 30 | 2.5h | £16.9/kW/yr |
| Ferrybridge BESS BMU-2 | 76 | 3.3h | £12.8/kW/yr |
| East Cambridgeshirethis battery | 24 | 3h | £8.5/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.