27 MW, about 68 MWh (2.5 hours, from the capacity market de-rating class) in South Lancashire, Yorkshire and Humber. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.
What it is
| Registered power | 27 MW response and reserve auction registration |
| Storage duration | 2.5 hours capacity market de-rating class |
| Charging zone | South Lancashire, Yorkshire and Humber |
| Connection site | Chorley |
| Postcode | PR7 5XG |
| Balancing mechanism unit | 2__GFLEX009 a supplier unit registered by the company that trades it; its balancing actions are counted on this page |
Who owns it and who trades it
| Traded by | Flexitricity Limitedruns several sitesconfirmed, Elexon's register |
| Owned by | PULSE CLEAN ENERGY SPV ANNING LIMITED |
| Owner established from | capacity market registered holder |
| Ultimately | Pulse Clean Energy confirmed source |
How we know. Pulse Clean Energy UK Limited was Green Frog Power 214 Limited until December 2021 and Pulse Clean Energy Limited was Green Frog Power Limited until January 2022. Both sit under Pulse Clean Energy Topco Limited.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it is built from
| Battery system | Canadian Solar e-STORAGE (supplier lists "Townlane, Ipsum", 74.25 MWh) |
| Engineering and construction | Ipsum |
From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed (Pulse names Town Lane, Charnock Richard, 30 MW / 60 MWh). Checked 2026-10-06. source 1 · source 2. Fields not shown are not published anywhere we have found, and we do not guess them.
What it earned
| Line | 364 days to 11 November 2026 |
|---|---|
| Balancing mechanism | £351k |
| Response and reserve auctions auction implied | £358k |
| Capacity market | £149k |
| Three lines together | £858k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 5,680 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 10 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 298 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 19,025 MWh |
| Metered import, what crossed the meter in | 22,159 MWh |
| Equivalent full cycles, everything sent out over one full charge | 282 over 298 days, 345 a year at that rate |
| Apparent meter to meter efficiency | 86%, an ordinary battery: round trip losses alone |
| Balancing offers accepted | 7,862 MWh |
| Balancing bids accepted | 8,251 MWh |
| Position outside balancing, export | 19,721 MWh |
| Position outside balancing, import | 22,466 MWh |
| Of which expected response delivery, net | −1,074 MWh 951 out, 2,025 in |
| Traded position, net | −1,671 MWh 20,578 out, 22,249 in |
| Traded position at the market index, sold | £2.8m |
| Traded position at the market index, bought | £1.8m |
| Traded position, net, at the index | £955k |
| Response delivery, net, at the imbalance price | −£241k −£228k at the index |
| Balancing and outside balancing together | £1.1m £49.91/kW/yr |
This battery connects to a distribution network. For such a unit the volumes Elexon publishes are settlement volumes: the site's own meter multiplied by the network operator's line loss factor for that half hour. The factor is usually within a few per cent of one, so the megawatt hours, cycles and efficiency above can sit a little above or below what crossed the site's meter. The money is settled on the same adjusted volumes. Method and caveats
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £109.56. What it sent out was worth £135.42 a megawatt hour at that same index, 1.24 times the average. What it took in was worth £82.34, 0.75 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 8,251 MWh of accepted bids it paid an average of £86.10 a megawatt hour. The market index averaged £126.26 across those same half hours, so it bought back at £40.16 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| below zero | 698 MWh | −£20.85 | £15k received |
| £0 to £25 | 485 MWh | £10.47 | £5k |
| £25 to £50 | 686 MWh | £39.61 | £27k |
| £50 to £75 | 1,109 MWh | £62.31 | £69k |
| £75 to £100 | 1,597 MWh | £88.70 | £142k |
| above £100 | 3,675 MWh | £131.12 | £482k |
On 698 MWh the price was below zero: NESO paid this unit an average of £20.85 a megawatt hour to take energy, £15k in all. That is a constrained network with more generation on it than it can move.
The other direction, offers, is much smaller here: 7,862 MWh where NESO asked for more, paid at an average of £139.56 against an index of £95.79.
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- only 298 of 364 days metered
- the meter exceeded the 27.0 MW registration on 14 days between 2026-02-18 and 2026-09-06, peaking at 31 MW export and 32 MW import: more than this battery can do, so another asset on the same meter, a commissioning period, or a settlement run error
Where it stands
| All three measured lineswhole fleet, £/kW/yr | 68th percentile234 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Mannington | 29 | 2h | £149.2/kW/yr |
| Tiln | 25 | 2h | £44.6/kW/yr |
| Blackpool | 25 | 2h | £38.3/kW/yr |
| Charnock Richardthis battery | 27 | 2.5h | £31.9/kW/yr |
| West Bradford | 29 | 2.5h | £29.7/kW/yr |
| Whitebirk BESS | 25 | 2h | £27.3/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.
Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.