Neilston Battery 1
50 MW, about 95 MWh (1.9 hours, measured from its behaviour) in Stirlingshire and Fife. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.
What it is
| Registered power | 50 MW balancing mechanism registration |
| Storage duration | 1.9 hours measured from twenty one days of behaviour |
| Charging zone | Stirlingshire and Fife |
| Connection site | Neilston |
| Balancing mechanism unit | T_NLSTB-1 |
Who owns it and who trades it
| Traded by | Statkraft Markets Gmbhruns several sitesconfirmed, Elexon's register |
| Owned by | not published anywhere we can read |
| Ultimately | Statkraft confirmed source |
How we know. The register names no owner. Neilston Greener Grid Park is Statkraft's own 50 MW transmission connected battery, built under the second stability pathfinder, and Statkraft is also the lead party here.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it is built from
| Battery system | Fluence, transmission connected, built for synthetic inertia and short circuit strength |
| Connection voltage | 400 kV matched to queue site: Neilston 400kV Substation |
From published documents, not from any register: supplier and contractor project pages, owner announcements and the trade press. Confidence: confirmed (supplier, owner). Checked 2026-08-31. source 1. Fields not shown are not published anywhere we have found, and we do not guess them.
What it earned
| Line | 364 days to 11 November 2026 |
|---|---|
| Balancing mechanism | −£148k |
| Response and reserve auctions auction implied | £0 |
| Capacity market | no agreement we can attach |
| Three lines together | not netted |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held no frequency response contract in the window, so the whole position is treated as traded. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 2,351 MWh |
| Metered import, what crossed the meter in | 3,746 MWh |
| Equivalent full cycles, everything sent out over one full charge | 24.7 over 358 days, 25.2 a year at that rate |
| Apparent meter to meter efficiency | 63%, not ordinary battery losses alone |
| Balancing offers accepted | 369 MWh |
| Balancing bids accepted | 351 MWh |
| Position outside balancing, export | 2,462 MWh |
| Position outside balancing, import | 3,875 MWh |
| Valued at the market index, sold | £433k |
| Valued at the market index, bought | £504k |
| Outside balancing, net, at the index | −£71k |
| Balancing and outside balancing together | −£75k £-1.52/kW/yr |
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £176.00 a megawatt hour at that same index, 1.68 times the average. What it took in was worth £130.11, 1.24 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 351 MWh of accepted bids it paid an average of £142.62 a megawatt hour. The market index averaged £190.06 across those same half hours, so it bought back at £47.44 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| £0 to £25 | 38 MWh | £16.09 | £617 |
| £25 to £50 | 2 MWh | £43.79 | £91 |
| £50 to £75 | 29 MWh | £58.89 | £2k |
| above £100 | 282 MWh | £169.22 | £48k |
The other direction, offers, is much smaller here: 369 MWh where NESO asked for more, paid at an average of £125.89 against an index of £88.57.
Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.
Where it stands
| Balancing incomewhole fleet, £/kW/yr | 5th percentile103 units | |
| Balancing incomeScotland peer group | 7th percentile28 units | |
| Balancing income1.9 hour duration cohort | 2nd percentile62 units | |
| All three measured lineswhole fleet, £/kW/yr | 10th percentile234 units | |
| Energy sent outhours at full power | 4th percentile101 units | |
| Energy taken inhours at full power | 4th percentile101 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in Scotland, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Camilla | 49 | 1.5h | £99.7/kW/yr |
| Wishaw BESS | 51 | 2h | £40.4/kW/yr |
| East Ayrshire (KILSB-2) | 52 | 2h | £2.7/kW/yr |
| Shilton Lane BESS | 40 | 2h | £2.3/kW/yr |
| Erskine BESS | 30 | 2h | £1.6/kW/yr |
| Neilston Battery 1this battery | 50 | 1.9h | not netted |
The three lines are not added together for this site. It paid £240k to charge and the lines we can measure paid it £92k. The energy it bought was sold in the wholesale market and nothing published measures that sale, so subtracting one from the other would show a loss it does not make. Sites in this position are usually constraint assets, paid to absorb wind the network cannot move south.
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.
Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.