100 MW, about 200 MWh (2 hours, published by Statera Energy) in Essex and Kent. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.

Part of Thurrock Flexible, one of 3 balancing units at one site totalling 300 MW. This page is the T_THURB-1 unit alone.

What it is

Registered power100 MW balancing mechanism registration
Storage duration2 hours published by Statera Energy
Charging zoneEssex and Kent
Connection siteTilbury 275kV
PostcodeRM18 8QR
Balancing mechanism unitT_THURB-1

Where the duration comes from. Statera Energy announced Thurrock Storage on 18 August 2025 as 300 MW and 600 MWh, a two hour system first planned as a one hour project, connected at National Grid's Tilbury substation (Energy-Storage.News, 21 August 2025, energy-storage.news). The site is three units of 100 MW, so each is a two hour battery. Since late June 2026 batteries have told NESO how much energy they could deliver and how much they could take in. This unit's declarations since 24 September 2026 vary too much to measure its size from them. Every megawatt hour figure on this site for this battery is worked from 2 hours.

Who owns it and who trades it

Traded byTHURROCK STORAGE LIMITEDconfirmed, Elexon's register
Owned byTHURROCK FLEXIBLE GENERATION LIMITED
Owner established fromconnection register applicant
UltimatelyStatera Energy confirmed source

How we know. Statera's own project list and its Thurrock commissioning coverage.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it earned

Line364 days to 11 November 2026
Balancing mechanism£4.8m
Response and reserve auctions auction implied£784k
Capacity market£1.8m
Three lines together£7.3m

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 4,900 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 5 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out70,250 MWh
Metered import, what crossed the meter in82,835 MWh
Equivalent full cycles, everything sent out over one full charge351 over 358 days, 358 a year at that rate
Apparent meter to meter efficiency85%, an ordinary battery: round trip losses alone
Balancing offers accepted66,963 MWh
Balancing bids accepted38,431 MWh
Position outside balancing, export59,719 MWh
Position outside balancing, import100,836 MWh
Of which expected response delivery, net−12,695 MWh 2,808 out, 15,503 in
Traded position, net−28,422 MWh 61,921 out, 90,343 in
Traded position at the market index, sold£8.1m
Traded position at the market index, bought£8.3m
Traded position, net, at the index−£201k
Response delivery, net, at the imbalance price−£1.1m −£1.1m at the index
Balancing and outside balancing together£3.7m £37.70/kW/yr

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £130.33 a megawatt hour at that same index, 1.25 times the average. What it took in was worth £91.55, 0.88 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

What it paid to buy energy back

When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 38,431 MWh of accepted bids it paid an average of £91.36 a megawatt hour. The market index averaged £122.74 across those same half hours, so it bought back at £31.38 a megawatt hour below the going price.

Price it paidVolumeAverageCash
below zero2,629 MWh−£22.13£58k received
£0 to £252,007 MWh£14.42£29k
£25 to £502,153 MWh£37.84£81k
£50 to £754,777 MWh£64.86£310k
£75 to £1008,638 MWh£88.03£760k
above £10018,227 MWh£131.06£2.4m

On 2,629 MWh the price was below zero: NESO paid this unit an average of £22.13 a megawatt hour to take energy, £58k in all. That is a constrained network with more generation on it than it can move.

The other direction, offers, is much smaller here: 66,963 MWh where NESO asked for more, paid at an average of £127.49 against an index of £95.81.

Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.

Where it stands

Balancing incomewhole fleet, £/kW/yr96th percentile103 units
Balancing incomeEngland and Wales peer group95th percentile75 units
Balancing income2.0 hour duration cohort95th percentile63 units
All three measured lineswhole fleet, £/kW/yr95th percentile234 units
Energy sent outhours at full power97th percentile101 units
Energy taken inhours at full power64th percentile101 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Thurrock Flexible (THURB-1)this battery1002h£73.4/kW/yr
Thurrock Flexible (THURB-3)1002h£46.4/kW/yr
Dollymans Storage1022h£46.1/kW/yr
Thurrock Flexible (THURB-2)1002h£28.0/kW/yr
Lakeside BESS1052h£27.3/kW/yr
Hams Hall (HAMHB-1)1002.5h£0.2/kW/yr

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.

Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.