Owns 4 batteries at 2 sites, 402 MW, which is 5.2 per cent of everything operating in Great Britain. It sells that power itself: every registration names a company of its own as the seller.

4batteries, counting a re-registered battery once
402 MWof the 7,779 MW operating fleet
£70/kW/yrpaid across the three measured lines, against £42 for the whole fleet
4 of 4confirmed on a control filing or the owner's own statement

Who sells its power

The balancing mechanism register names the company allowed to sell each unit's power. That company is usually an optimiser or a supplier working under contract, which is why the registers cannot answer the ownership question on their own. Where the seller is one of the owner's own companies, the row says so.

Thurrock Storage Limited 300 MW · Dollymans Storage Limited 102 MW
SellerBatteriesMWOf this fleet
Thurrock Storage Limited the owner's own company330075%
Dollymans Storage Limited the owner's own company110225%

Thurrock Storage Limited, Dollymans Storage Limited is marked the owner's own company: Statera's own project pages name Statera as owner of Dollymans and Thurrock, unlike its other projects, where the pages name the owner separately. Source.

What it was paid

The three published lines, added up across the fleet for the 364 days to 27 September 2026. Wholesale trading income is invisible for every owner, not just this one, and nothing here nets the cost of charging. The rate is per kilowatt of current capacity.

Balancing mechanism, paid to discharge£21.9m
Balancing mechanism, paid out to charge−£8.9m
Response and reserve auctions£3.0m
Capacity market£3.1m
Income across the fleet, per kilowatt£69.67/kW/yr fleet 42.17
Median battery, all three lines£67.42/kW/yr
Hours at full power, sent out484 h/yr
Hours at full power, taken in286 h/yr

What the fleet is made of

Duration, by megawatt

about 1.5 hours 200 MW · 2 hours and up 202 MW

Region, by megawatt

England and Wales 402 MW

Every battery it owns

BatteryMWSold byGrade£/kW/yr
Dollymans Storage
Essex and Kent
102Dollymans Storage Limitedconfirmed67.42
Thurrock Flexible (THURB-1)
Essex and Kent
100Thurrock Storage Limitedconfirmed95.60
Thurrock Flexible (THURB-3)
Essex and Kent
100Thurrock Storage Limitedconfirmed66.74
Thurrock Flexible (THURB-2)
Essex and Kent
100Thurrock Storage Limitedconfirmed48.96

How we know

Confirmed means a control filing at Companies House, or the owner's own published statement, names the company. Probable means the evidence is strong and indirect. Named means the register leaves the owner blank, the balancing code carries the owner's initials, and a sibling unit at the same site is already settled. Each chain below is printed once, with the batteries it settles.

Confirmed Thurrock Flexible (THURB-1), Thurrock Flexible (THURB-3), Thurrock Flexible (THURB-2)
Statera's own project list and its Thurrock commissioning coverage. Source

Confirmed Dollymans Storage
Statera's own page for each project names Statera Energy as both project developer and project owner. Source

Attribution. A battery belongs to whoever the documents name today, so a fleet that changed hands during the year credits the whole year to the current owner. Groups are joined only where a filing joins them; a company that holds through several vehicles appears once, under the name at the top of the chain. Directors and registered offices are never used as evidence on their own. Why the registers cannot answer this question