Tye Lane BESS
59 MW, about 237 MWh (4 hours, from the capacity market de-rating class) in Mid Wales and The Midlands. Everything on this page is read from published data for the 364 days to 27 September 2026, or is labelled as an estimate.
What it is
| Registered power | 59 MW balancing mechanism registration |
| Storage duration | 4 hours capacity market de-rating class |
| Charging zone | Mid Wales and The Midlands |
| Connection site | Mid Suffolk |
| Postcode | IP8 4JL |
| Balancing mechanism unit | T_TYLNB-1 |
Who owns it and who trades it
| Traded by | Pivoted Power LLPruns several sitesconfirmed, Elexon's register |
| Owned by | DAMSONGREEN ENERGYFARM LIMITED |
| Owner established from | capacity market registered holder |
| Ultimately | Pivot Power (EDF Renewables UK) confirmed source |
How we know. The control filing gives Damsongreen Energyfarm Limited to EDF Energy Renewables Limited at three quarters or more with the right to appoint directors, since January 2024. The capacity market agrees, holding a site called Pivot Power Bramford 230 metres away in the same name, and Powersystems' own project page gives Tye Lane and Bramford as one site.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 27 September 2026 |
|---|---|
| Balancing mechanism | £1.3m |
| Response and reserve auctions auction implied | £102k |
| Capacity market | £280k |
| Three lines together | £1.7m |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 7,474 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 9 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 346 days to 12 September 2026, 33 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 35,367 MWh |
| Metered import, what crossed the meter in | 49,180 MWh |
| Equivalent full cycles, everything sent out over one full charge | 149 over 346 days, 158 a year at that rate |
| Apparent meter to meter efficiency | 72%, worth investigating: more than ordinary losses |
| Balancing offers accepted | 29,728 MWh |
| Balancing bids accepted | 20,911 MWh |
| Position outside balancing, export | 30,893 MWh |
| Position outside balancing, import | 53,523 MWh |
| Of which expected response delivery, net | −8,215 MWh 1,895 out, 10,110 in |
| Traded position, net | −14,416 MWh 34,459 out, 48,875 in |
| Traded position at the market index, sold | £4.1m |
| Traded position at the market index, bought | £3.8m |
| Traded position, net, at the index | £330k |
| Response delivery, net, at the imbalance price | −£947k −£891k at the index |
| Balancing and outside balancing together | £735k £13.09/kW/yr |
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £93.43. What it sent out was worth £118.56 a megawatt hour at that same index, 1.27 times the average. What it took in was worth £76.83, 0.82 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 20,911 MWh of accepted bids it paid an average of £79.79 a megawatt hour. The market index averaged £104.54 across those same half hours, so it bought back at £24.75 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| below zero | 1,123 MWh | −£14.91 | £17k received |
| £0 to £25 | 1,183 MWh | £12.34 | £15k |
| £25 to £50 | 1,332 MWh | £38.58 | £51k |
| £50 to £75 | 3,978 MWh | £65.19 | £259k |
| £75 to £100 | 7,543 MWh | £87.93 | £663k |
| above £100 | 5,753 MWh | £121.11 | £697k |
On 1,123 MWh the price was below zero: NESO paid this unit an average of £14.91 a megawatt hour to take energy, £17k in all. That is a constrained network with more generation on it than it can move.
The other direction, offers, is much smaller here: 29,728 MWh where NESO asked for more, paid at an average of £101.60 against an index of £76.34.
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- the meter exceeded the 59.2 MW registration on 8 days between 2026-05-19 and 2026-06-08, peaking at 59 MW export and 100 MW import: more than this battery can do, so another asset on the same meter, a commissioning period, or a settlement run error
Where it stands
| Balancing incomewhole fleet, £/kW/yr | 74th percentile98 units | |
| Balancing incomeEngland and Wales peer group | 64th percentile70 units | |
| All three measured lineswhole fleet, £/kW/yr | 77th percentile229 units | |
| Energy sent outhours at full power | 78th percentile96 units | |
| Energy taken inhours at full power | 63rd percentile96 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. Duration is not used to choose them, because too few batteries sit within half an hour of this one. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Ocker Hill | 58 | 2h | £64.0/kW/yr |
| Monk Fryston | 57 | 2h | £44.4/kW/yr |
| Sizing John | 57 | 2h | £43.4/kW/yr |
| Tye Lane BESSthis battery | 59 | 4h | £29.1/kW/yr |
| County Durham (FBPG02) | 59 | not known | £23.8/kW/yr |
| Native River | 57 | 2h | £20.8/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.