20 MW, about 30 MWh (1.5 hours, from the capacity market de-rating class) in Cotswold. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.

What it is

Registered power20 MW response and reserve auction registration
Storage duration1.5 hours capacity market de-rating class
Charging zoneCotswold
Connection siteBristol, City of
PostcodeBS2 0TH
Balancing mechanism unit2__LFLEX001 a supplier unit registered by the company that trades it; its balancing actions are counted on this page

Who owns it and who trades it

Traded byFlexitricity Limitedruns several sitesconfirmed, Elexon's register
Owned byFEEDER GRID STORAGE LIMITED
Owner established fromcapacity market registered holder

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it earned

Line364 days to 11 November 2026
Balancing mechanism£381k
Response and reserve auctions auction implied£463k
Capacity market£229k
Three lines together£1.1m

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 9,405 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 15 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out9,320 MWh
Metered import, what crossed the meter in10,902 MWh
Equivalent full cycles, everything sent out over one full charge311 over 358 days, 317 a year at that rate
Apparent meter to meter efficiency86%, an ordinary battery: round trip losses alone
Balancing offers accepted5,053 MWh
Balancing bids accepted3,593 MWh
Position outside balancing, export8,868 MWh
Position outside balancing, import11,910 MWh
Of which expected response delivery, net−636 MWh 690 out, 1,326 in
Traded position, net−2,406 MWh 8,957 out, 11,363 in
Traded position at the market index, sold£1.1m
Traded position at the market index, bought£942k
Traded position, net, at the index£180k
Response delivery, net, at the imbalance price−£95k −£86k at the index
Balancing and outside balancing together£468k £23.84/kW/yr

This battery connects to a distribution network. For such a unit the volumes Elexon publishes are settlement volumes: the site's own meter multiplied by the network operator's line loss factor for that half hour. The factor is usually within a few per cent of one, so the megawatt hours, cycles and efficiency above can sit a little above or below what crossed the site's meter. The money is settled on the same adjusted volumes. Method and caveats

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £125.21 a megawatt hour at that same index, 1.20 times the average. What it took in was worth £82.86, 0.79 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

What it paid to buy energy back

When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 3,593 MWh of accepted bids it paid an average of £82.58 a megawatt hour. The market index averaged £120.78 across those same half hours, so it bought back at £38.20 a megawatt hour below the going price.

Price it paidVolumeAverageCash
below zero260 MWh−£18.79£5k received
£0 to £25262 MWh£12.76£3k
£25 to £50323 MWh£37.86£12k
£50 to £75531 MWh£62.74£33k
£75 to £100744 MWh£88.17£66k
above £1001,473 MWh£127.07£187k

On 260 MWh the price was below zero: NESO paid this unit an average of £18.79 a megawatt hour to take energy, £5k in all. That is a constrained network with more generation on it than it can move.

The other direction, offers, is much smaller here: 5,053 MWh where NESO asked for more, paid at an average of £134.49 against an index of £92.57.

Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.

Where it stands

All three measured lineswhole fleet, £/kW/yr76th percentile234 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Oldham BESS202h£78.5/kW/yr
Carnegie Road 1202h£56.3/kW/yr
Feeder Roadthis battery201.5h£53.8/kW/yr
Gerrards Cross BESS201h£37.4/kW/yr
Farnham BESS202h£35.0/kW/yr
Hawkers Hill Battery202h£34.1/kW/yr

In its distribution register

The distribution register of National Grid Electricity Distribution lists this site as Bristol feeder road feeder grid storage limited, 24 MW, connected on 10 February 2023. Matched on the same owner, 0 km apart.

See it on the Development Atlas

From each operator’s embedded capacity register, read every Monday. How the registers are linked to the units that trade.

See it on the map

Open the operating map here

Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.

Need every battery at once? The register is not offered for automated download, and bulk access is by request at hello@vitreouslabs.com.