Whitegate
58 MW, about 157 MWh (2.7 hours, published by Constantine Energy Storage) in South Lancashire, Yorkshire and Humber. Everything on this page is read from published data for the 364 days to 15 November 2026, or is labelled as an estimate.
What it is
| Registered power | 58 MW balancing mechanism registration |
| Storage duration | 2.7 hours published by Constantine Energy Storage |
| Charging zone | South Lancashire, Yorkshire and Humber |
| Connection site | Whitegate 275kV |
| Postcode | OL9 |
| Balancing mechanism unit | T_WTGTB-1 |
Where the duration comes from. Constantine Energy Storage, which owns the battery, announced in February 2025 that its five 57 MW batteries (Ocker Hill, Whitegate, Monk Fryston, Capenhurst and Legacy) are 2.7 hour systems, about 154 MWh each, with Habitat Energy trading the first three and EDF the other two (Solar Power Portal, 17 February 2025, solarpowerportal.co.uk). Sungrow, which supplied the batteries, gave Ocker Hill and Capenhurst as 57 MW and 165 MWh each in March 2023, before they were built, about 2.9 hours (sungrowpower.com). This page takes the later and lower figure. Until 25 October 2026 it gave no duration. What the battery declares to NESO agrees: in the fullest 5% of 607 half hours from 12 to 24 October 2026, the energy it held plus its room to charge came to 163 MWh, a little more than 154 MWh. Every megawatt hour figure on this site for this battery is worked from 2.7 hours.
Who owns it and who trades it
| Traded by | HD144WHI Ltdconfirmed, Elexon's register |
| Owned by | not published anywhere we can read |
| Ultimately | Constantine Energy Storage confirmed source |
How we know. The register names no owner. Constantine Energy Storage named Whitegate, near Manchester, as one of its five 57 MW batteries in February 2025, and the planning database holds Whitegate Battery Storage, 57 MW, Oldham, under Pelagic Energy (Constantine Energy). The lead party HD144WHI Ltd is named as its sister project companies are; its own filings have not been read.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
What it earned
| Line | 364 days to 15 November 2026 |
|---|---|
| Balancing mechanism | −£719k |
| Response and reserve auctions auction implied | £66k |
| Capacity market | no agreement we can attach |
| Three lines together | not netted |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 8 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 175 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 8,302 MWh |
| Metered import, what crossed the meter in | 10,401 MWh |
| Equivalent full cycles, everything sent out over one full charge | 53.0 over 175 days, 111 a year at that rate |
| Apparent meter to meter efficiency | 80%, plausible: losses plus a standing load that is material against a modest throughput |
| Balancing offers accepted | 3,090 MWh |
| Balancing bids accepted | 5,978 MWh |
| Position outside balancing, export | 10,564 MWh |
| Position outside balancing, import | 9,775 MWh |
| Of which expected response delivery, net | −28 MWh 0 out, 28 in |
| Traded position, net | 817 MWh 10,564 out, 9,747 in |
| Traded position at the market index, sold | £2.0m |
| Traded position at the market index, bought | £1.1m |
| Traded position, net, at the index | £910k |
| Response delivery, net, at the imbalance price | −£6k −£6k at the index |
| Balancing and outside balancing together | £489k £17.58/kW/yr |
When it moved, against when power was dear
Across every half hour this unit was metered the market index averaged £123.26. What it sent out was worth £190.23 a megawatt hour at that same index, 1.54 times the average. What it took in was worth £112.86, 0.92 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.
What it paid to buy energy back
When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 5,978 MWh of accepted bids it paid an average of £144.10 a megawatt hour. The market index averaged £189.48 across those same half hours, so it bought back at £45.38 a megawatt hour below the going price.
| Price it paid | Volume | Average | Cash |
|---|---|---|---|
| below zero | 24 MWh | −£10.51 | £253 received |
| £0 to £25 | 84 MWh | £18.83 | £2k |
| £25 to £50 | 97 MWh | £35.20 | £3k |
| £50 to £75 | 86 MWh | £65.24 | £6k |
| £75 to £100 | 604 MWh | £89.98 | £54k |
| above £100 | 5,083 MWh | £156.74 | £797k |
On 24 MWh the price was below zero: NESO paid this unit an average of £10.51 a megawatt hour to take energy, £253 in all. That is a constrained network with more generation on it than it can move.
The other direction, offers, is much smaller here: 3,090 MWh where NESO asked for more, paid at an average of £144.46 against an index of £99.74.
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- only 175 of 364 days metered
Where it stands
| Balancing incomewhole fleet, £/kW/yr | 85th percentile104 units | |
| Balancing incomeEngland and Wales peer group | 80th percentile76 units | |
| Balancing income2.7 hour duration cohort | 90th percentile11 units | |
| All three measured lineswhole fleet, £/kW/yr | 21st percentile234 units | |
| Energy sent outhours at full power | 33rd percentile102 units | |
| Energy taken inhours at full power | 30th percentile102 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in England and Wales, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Ocker Hill | 58 | 2.7h | £56.2/kW/yr |
| Monk Fryston | 57 | 2.7h | £33.0/kW/yr |
| Sizing John | 57 | 2.5h | £31.9/kW/yr |
| Capenhurst | 57 | 2.7h | £27.7/kW/yr |
| Thame Road BESS | 50 | 2.4h | £8.7/kW/yr |
| Whitegatethis battery | 58 | 2.7h | not netted |
The three lines are not added together for this site. It paid £1.2m to charge and the lines we can measure paid it £568k. The energy it bought was sold in the wholesale market and nothing published measures that sale, so subtracting one from the other would show a loss it does not make.