Batteriespeicher Sonnenwende Busdorf

1.6 MW, 4.2 MWh (2.6 hours) in Busdorf, Schleswig-Holstein, registered as operating since 3 November 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Batteriespeicher Sonnenwende BusdorfSEE9057574640161.64.23 November 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
reon AGAmtsgericht Walsrode HRB 200524Lilienthal, Niedersachsen

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companySchleswig-Holstein Netz GmbH
Connected atmedium voltage
MunicipalityBusdorf, district of Schleswig-Flensburg
StateSchleswig-Holstein
Land parcelBusdorf, Flur 5, Flurstück 52/9
Registered position54.4791, 9.5500
Register locationSEL903124742118

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Batteriespeicher Sonnenwende BusdorfInn24-1/00910 July 2024reon AG5.5

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 10 November 2026; last changed in the register on 10 November 2026.

SeenUnitWhat changedFromTo
11 November 2026Batteriespeicher Sonnenwende BusdorfBetriebsStatusId3135
11 November 2026Batteriespeicher Sonnenwende BusdorfCadastral districtblankBusdorf
11 November 2026Batteriespeicher Sonnenwende BusdorfCommissioning dateblank3 November 2026
11 November 2026Batteriespeicher Sonnenwende BusdorfEegAnlageRegistrierungsdatum31 July 202610 November 2026
11 November 2026Batteriespeicher Sonnenwende BusdorfEegInbetriebnahmeDatumblank3 November 2026
11 November 2026Batteriespeicher Sonnenwende BusdorfEinheitRegistrierungsdatum26 April 202410 November 2026
11 November 2026Batteriespeicher Sonnenwende BusdorfGross power1.5 MW1.6 MW
11 November 2026Batteriespeicher Sonnenwende BusdorfHouse number4blank
11 November 2026Batteriespeicher Sonnenwende BusdorfLatitude54.47705554.479137
11 November 2026Batteriespeicher Sonnenwende BusdorfLocation as published24866 Busdorf; Deutschland24866 Busdorf
11 November 2026Batteriespeicher Sonnenwende BusdorfLongitude9.5494459.549957
11 November 2026Batteriespeicher Sonnenwende BusdorfNet power1.5 MW1.6 MW
11 November 2026Batteriespeicher Sonnenwende BusdorfParcelblankFlur 5, Flurstück 52/9
11 November 2026Batteriespeicher Sonnenwende BusdorfPlanned date30 September 2026blank
11 November 2026Batteriespeicher Sonnenwende BusdorfRegister locationblankSEL903124742118
11 November 2026Batteriespeicher Sonnenwende BusdorfRegister location idblank10546596
11 November 2026Batteriespeicher Sonnenwende BusdorfStatusIn PlanungIn Betrieb
11 November 2026Batteriespeicher Sonnenwende BusdorfStreetAm Königshügelblank
11 November 2026Batteriespeicher Sonnenwende BusdorfUsable capacity3.9 MWh4.2 MWh
24 November 2026Batteriespeicher Sonnenwende BusdorfCommissioning date3 November 2026
24 November 2026Batteriespeicher Sonnenwende BusdorfNet power1.5 MW1.6 MW
24 November 2026Batteriespeicher Sonnenwende BusdorfPlanned date30 September 2026
24 November 2026Batteriespeicher Sonnenwende BusdorfStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.