BESS Wutzldorf

5 MW, 25 MWh (5 hours) in Wald, Bayern, registered as operating since 8 October 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
BESS WutzldorfSEE9902416415785258 October 2026732under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
BESS Wutzldorf GmbhAmtsgericht Traunstein HRA 34228Traunstein, Bayern

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyBayernwerk Netz GmbH
Connected atmedium voltage
MunicipalityWald, district of Cham
StateBayern
Land parcelWald, Flurstück 1580/2
Registered position49.1382, 12.3474
Register locationSEL902554981210

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 23 October 2026; last changed in the register on 23 October 2026.

SeenUnitWhat changedFromTo
25 October 2026BESS WutzldorfBetriebsStatusId3135
25 October 2026BESS WutzldorfCommissioning dateblank8 October 2026
25 October 2026BESS WutzldorfEinheitRegistrierungsdatum25 September 202623 October 2026
25 October 2026BESS WutzldorfPlanned date8 October 2026blank
25 October 2026BESS WutzldorfRegister locationblankSEL902554981210
25 October 2026BESS WutzldorfRegister location idblank10482650
25 October 2026BESS WutzldorfStatusIn PlanungIn Betrieb
25 October 2026BESS WutzldorfVollTeilEinspeisungblank688
25 October 2026BESS WutzldorfVollTeilEinspeisungBezeichnungblankVolleinspeisung
24 November 2026BESS WutzldorfCommissioning date8 October 2026
24 November 2026BESS WutzldorfNet power5 MW5 MW
24 November 2026BESS WutzldorfPlanned date8 October 2026
24 November 2026BESS WutzldorfStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.