Vitreous LabsEnergy transparency

PASM Großspeicher Bamberg

9.4 MW, 51 MWh (5.4 hours) in Bamberg, Bayern, registered as operating since 7 August 2024. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
PASM Großspeicher Bamberg I (Intillion)SEE9215099392435.4277 August 2024727checked
PASM Großspeicher Bamberg II (Pixii)SEE90039205926942426 October 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
PASM Power and Air Condition Solution Management GmbHAmtsgericht München HRB 202919München, Bayern

Owner. Deutsche Telekom AG, through Deutsche Telekom AG (100%). From the owner’s own publication. Evidence: PASM (Power & Air Solutions) website, About us: "We are a wholly-owned subsidiary of Deutsche Telekom AG.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyStadtwerke Bamberg Energie- und Wasserversorgungs GmbH
Connected atmedium voltage
MunicipalityBamberg
StateBayern
Registered position49.8833, 10.9259
Register locationSEL982378935224, SEL984065657990

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 29 November 2024; last changed in the register on 16 November 2026.

SeenUnitWhat changedFromTo
27 October 2026PASM Großspeicher Bamberg II (Pixii)BetriebsStatusId3135
27 October 2026PASM Großspeicher Bamberg II (Pixii)Commissioning dateblank26 October 2026
27 October 2026PASM Großspeicher Bamberg II (Pixii)EinheitRegistrierungsdatum23 October 202526 October 2026
27 October 2026PASM Großspeicher Bamberg II (Pixii)Planned date30 April 2026blank
27 October 2026PASM Großspeicher Bamberg II (Pixii)Register locationblankSEL984065657990
27 October 2026PASM Großspeicher Bamberg II (Pixii)Register location idblank10490912
27 October 2026PASM Großspeicher Bamberg II (Pixii)StatusIn PlanungIn Betrieb
19 November 2026PASM Großspeicher Bamberg I (Intillion)AnlagenbetreiberMaskedNamePASM GmbHPASM Power and Air Condition Solution Management GmbH
19 November 2026PASM Großspeicher Bamberg I (Intillion)OperatorPASM GmbHPASM Power and Air Condition Solution Management GmbH
19 November 2026PASM Großspeicher Bamberg II (Pixii)AnlagenbetreiberMaskedNamePASM GmbHPASM Power and Air Condition Solution Management GmbH
19 November 2026PASM Großspeicher Bamberg II (Pixii)OperatorPASM GmbHPASM Power and Air Condition Solution Management GmbH
24 November 2026PASM Großspeicher Bamberg I (Intillion)Net power5.4 MW5.4 MW
24 November 2026PASM Großspeicher Bamberg II (Pixii)Commissioning date26 October 2026
24 November 2026PASM Großspeicher Bamberg II (Pixii)Net power4 MW4 MW
24 November 2026PASM Großspeicher Bamberg II (Pixii)Planned date30 April 2026
24 November 2026PASM Großspeicher Bamberg II (Pixii)StatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.