PVA Lalendorf BESS InnoAus

5.8 MW, 15 MWh (2.6 hours) in Lalendorf, Mecklenburg-Vorpommern, registered as operating since 22 October 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
PVA Lalendorf BESS InnoAusSEE9310801052345.81522 October 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Vogelsang PV GmbH & Co. KGAmtsgericht Berlin (Charlottenburg) HRB 260952BBerlin, Berlin

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyWEMAG Netz GmbH
Connected atmedium voltage
MunicipalityLalendorf, district of Rostock
StateMecklenburg-Vorpommern
Land parcelLalendorf, Flur 2: 104
Registered position53.7550, 12.4040
Register locationSEL950643080801

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
PVA Lalendorf BESS InnoAusInn25-1/10210 July 2025Vogelsang PV GmbH21

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 11 November 2026; last changed in the register on 11 November 2026.

SeenUnitWhat changedFromTo
12 November 2026PVA Lalendorf BESS InnoAusBetriebsStatusId3135
12 November 2026PVA Lalendorf BESS InnoAusCommissioning dateblank22 October 2026
12 November 2026PVA Lalendorf BESS InnoAusEegAnlageRegistrierungsdatum28 April 202511 November 2026
12 November 2026PVA Lalendorf BESS InnoAusEegInbetriebnahmeDatumblank22 October 2026
12 November 2026PVA Lalendorf BESS InnoAusEinheitRegistrierungsdatum28 April 202511 November 2026
12 November 2026PVA Lalendorf BESS InnoAusPlanned date15 October 2026blank
12 November 2026PVA Lalendorf BESS InnoAusRegister locationblankSEL950643080801
12 November 2026PVA Lalendorf BESS InnoAusRegister location idblank10550499
12 November 2026PVA Lalendorf BESS InnoAusStatusIn PlanungIn Betrieb
12 November 2026PVA Lalendorf BESS InnoAusTender awardblankInn25-1/102
24 November 2026PVA Lalendorf BESS InnoAusCommissioning date22 October 2026
24 November 2026PVA Lalendorf BESS InnoAusNet power5.8 MW5.8 MW
24 November 2026PVA Lalendorf BESS InnoAusPlanned date15 October 2026
24 November 2026PVA Lalendorf BESS InnoAusStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.