Solar-Speicher-Kraftwerk Gutengermendorf

15 MW, 30 MWh (2 hours) in Löwenberger Land, Brandenburg, registered as operating since 14 October 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Solar-Speicher-Kraftwerk Gutengermendorf IISEE932637272065102014 October 2026727under check
Solar-Speicher-Kraftwerk Gutengermendorf ISEE9179837777235.01015 October 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
PT Investitionen GmbHAmtsgericht Neuruppin HRB 13750Löwenberger Land, Brandenburg

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyE.DIS Netz GmbH
Connected atmedium voltage
MunicipalityLöwenberger Land, district of Oberhavel
StateBrandenburg
Land parcelGutengermendorf, 2 und 112/2, 109/1; Gutengermendorf, 2 und 113/2
Registered position52.9496, 13.1764
Register locationSEL908265112769, SEL980794458242

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Solar-Speicher-Kraftwerk Gutengermendorf IISOL25-1/366not in the award lists held
Solar-Speicher-Kraftwerk Gutengermendorf ISOL25-1/366not in the award lists held

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 5 November 2026; last changed in the register on 5 November 2026.

SeenUnitWhat changedFromTo
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IBattery typeblank727
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IBetriebsStatusId3135
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf ICommissioning dateblank15 October 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IEegAnlageRegistrierungsdatum23 August 20245 November 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IEegInbetriebnahmeDatumblank15 October 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IEinheitRegistrierungsdatum23 August 20245 November 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IGross power4.1 MW5.0 MW
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIsEinheitNotstromaggregatblankFalse
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf INet power2 MW5.0 MW
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IParcel2 und 279, 112/2, 113/2, 109/12 und 113/2
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IPlanned date1 February 2027blank
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IRegister locationblankSEL980794458242
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IRegister location idblank10528656
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IStatusIn PlanungIn Betrieb
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf ITender awardblankSOL25-1/366
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IUsable capacity4.1 MWh10 MWh
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIBattery typeblank727
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIBetriebsStatusId3135
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IICommissioning dateblank14 October 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIEegAnlageRegistrierungsdatum23 August 20245 November 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIEegInbetriebnahmeDatumblank14 October 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIEinheitRegistrierungsdatum23 August 20245 November 2026
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIGross power4.1 MW10 MW
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIIsEinheitNotstromaggregatblankFalse
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IINet power2 MW10 MW
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIParcel2 und 279, 112/2, 113/2, 109/12 und 112/2, 109/1
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIPlanned date1 February 2027blank
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIRegister locationblankSEL908265112769
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIRegister location idblank10528827
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIStatusIn PlanungIn Betrieb
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IITender awardblankSOL25-1/366
6 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIUsable capacity4.1 MWh20 MWh
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf ICommissioning date15 October 2026
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf INet power2 MW5.0 MW
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IPlanned date1 February 2027
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IStatusIn PlanungIn Betrieb
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IICommissioning date14 October 2026
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IINet power2 MW10 MW
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIPlanned date1 February 2027
24 November 2026Solar-Speicher-Kraftwerk Gutengermendorf IIStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.