Vitreous LabsEnergy transparency

Speicher Traxenberg

1.5 MW, 4.1 MWh (2.7 hours) in Thurmansbang, Bayern, registered as operating since 17 November 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Speicher TraxenbergSEE9694750209781.54.117 November 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Wirth Regenerative EnergienAmtsgericht Deggendorf HRB 3408Hengersberg, Bayern

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyBayernwerk Netz GmbH
Connected atmedium voltage
MunicipalityThurmansbang, district of Freyung-Grafenau
StateBayern
Land parcelThurmansbang, 2976
Registered position48.7635, 13.2971
Register locationSEL947332423070

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 18 November 2026; last changed in the register on 18 November 2026.

SeenUnitWhat changedFromTo
19 November 2026Speicher TraxenbergBetriebsStatusId3135
19 November 2026Speicher TraxenbergCommissioning dateblank17 November 2026
19 November 2026Speicher TraxenbergEegAnlageRegistrierungsdatum24 September 202618 November 2026
19 November 2026Speicher TraxenbergEegInbetriebnahmeDatumblank17 November 2026
19 November 2026Speicher TraxenbergEinheitRegistrierungsdatum24 September 202618 November 2026
19 November 2026Speicher TraxenbergPlanned date1 December 2026blank
19 November 2026Speicher TraxenbergRegister locationblankSEL947332423070
19 November 2026Speicher TraxenbergRegister location idblank10576860
19 November 2026Speicher TraxenbergStatusIn PlanungIn Betrieb
24 November 2026Speicher TraxenbergCommissioning date17 November 2026
24 November 2026Speicher TraxenbergNet power1.5 MW1.5 MW
24 November 2026Speicher TraxenbergPlanned date1 December 2026
24 November 2026Speicher TraxenbergStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.