5.4 MW, 12 MWh (2.2 hours) in Brunnthal, Bayern, registered as operating since 29 December 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Trading-BESS JSS2SEE92891792727536.119 October 2026727under check
Inno BESS BrunnthalSEE9319909885382.4629 December 2025727checked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Jochen Schweizer Solarpark 2 GmbH &. Co. KGAmtsgericht München HRA 115890Taufkirchen, Bayern

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyBayernwerk Netz GmbH
Connected atmedium voltage
MunicipalityBrunnthal, district of München
StateBayern
Land parcelBrunnthal, 946
Registered position48.0310, 11.6702
Register locationSEL954394126108, SEL990654279757

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Inno BESS BrunnthalInn24-1/02610 July 2024Jochen Schweizer Solarpark 2 GmbH & Co. KG8.4

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 30 December 2025; last changed in the register on 19 October 2026.

SeenUnitWhat changedFromTo
20 October 2026Trading-BESS JSS2BetriebsStatusId3135
20 October 2026Trading-BESS JSS2Commissioning dateblank19 October 2026
20 October 2026Trading-BESS JSS2EinheitRegistrierungsdatum8 April 202619 October 2026
20 October 2026Trading-BESS JSS2Planned date3 June 2026blank
20 October 2026Trading-BESS JSS2Register locationblankSEL954394126108
20 October 2026Trading-BESS JSS2Register location idblank10468242
20 October 2026Trading-BESS JSS2StatusIn PlanungIn Betrieb
24 November 2026Inno BESS BrunnthalNet power2.4 MW2.4 MW
24 November 2026Trading-BESS JSS2Commissioning date19 October 2026
24 November 2026Trading-BESS JSS2Net power3 MW3 MW
24 November 2026Trading-BESS JSS2Planned date3 June 2026
24 November 2026Trading-BESS JSS2StatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.