Triakku 15MwH

3 MW, 15 MWh (5 hours) in Kevelaer, Nordrhein-Westfalen, registered as operating since 1 October 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Triakku 15MwHSEE9672789072123151 October 2026727under check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Triakku GmbHAmtsgericht Kleve HRB 19691Uedem, Nordrhein-Westfalen

We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyWestnetz GmbH
Connected atmedium voltage
MunicipalityKevelaer, district of Kleve
StateNordrhein-Westfalen
Registered position51.5844, 6.2633
Register locationSEL987517529654

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 10 November 2026; last changed in the register on 10 November 2026.

SeenUnitWhat changedFromTo
11 November 2026Triakku 15MwHBetriebsStatusId3135
11 November 2026Triakku 15MwHCommissioning dateblank1 October 2026
11 November 2026Triakku 15MwHEinheitRegistrierungsdatum1 February 202610 November 2026
11 November 2026Triakku 15MwHPlanned date20 March 2026blank
11 November 2026Triakku 15MwHRegister locationblankSEL987517529654
11 November 2026Triakku 15MwHRegister location idblank10543835
11 November 2026Triakku 15MwHStatusIn PlanungIn Betrieb
24 November 2026Triakku 15MwHCommissioning date1 October 2026
24 November 2026Triakku 15MwHNet power3 MW3 MW
24 November 2026Triakku 15MwHPlanned date20 March 2026
24 November 2026Triakku 15MwHStatusIn PlanungIn Betrieb

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the register as read on 24 November 2026 and the public unit table of 24 November 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.