Vitreous LabsEnergy transparency

Grenaa battery

Being built, 50 MW · 163 MWh, in Norddjurs Municipality, owned by ENKA Energy Transition. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power50 MW
Capacity163 MWh
Duration3.3 hours
StatusBeing built, as of 25 October 2026
Owner’s dateQ1 2028, expected
Bidding zoneDK1, West Denmark
MunicipalityNorddjurs
Placed on the mapat Grenaa, the place its source names (GeoNames)
Nearest transmission stationÅstrup (150 kV), 1 km away: 86 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerENKA Energy Transition
DeveloperBattMan Energy

Not published anywhere we have found: ultimate owner, built by, optimiser.

What the sources say

BattMan sold the project to the British ENKA Energy Transition (DOI); BattMan lists it as under construction at 50 MW / 163 MWh (read 25 October 2026). ENKA's backer gave 50 MW / 150 MWh and commercial operation in the first quarter of 2028.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B026.

All batteries  ·  On the map