Vitreous LabsEnergy transparency

Svanninge battery, Faaborg

Announced, 100 MW · 200 MWh, in Faaborg-Midtfyn Municipality, developed by BattMan Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power100 MW
Capacity200 MWh
Duration2.0 hours
StatusAnnounced, as of 19 February 2025
Bidding zoneDK1, West Denmark
MunicipalityFaaborg-Midtfyn
Placed on the mapat Svanninge, the place its source names (GeoNames)
Nearest transmission stationAbildskov (150 kV), 14 km away: 59 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

DeveloperBattMan Energy

Not published anywhere we have found: owner, ultimate owner, built by, optimiser.

What the sources say

Screening decision of 19 February 2025; both figures are maximums ("op til"). Not on BattMan's list of projects being built.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B052.