Svanninge battery, Faaborg
Announced, 100 MW · 200 MWh, in Faaborg-Midtfyn Municipality, developed by BattMan Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 100 MW |
| Capacity | 200 MWh |
| Duration | 2.0 hours |
| Status | Announced, as of 19 February 2025 |
| Bidding zone | DK1, West Denmark |
| Municipality | Faaborg-Midtfyn |
| Placed on the map | at Svanninge, the place its source names (GeoNames) |
| Nearest transmission station | Abildskov (150 kV), 14 km away: 59 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Developer | BattMan Energy |
Not published anywhere we have found: owner, ultimate owner, built by, optimiser.
What the sources say
Screening decision of 19 February 2025; both figures are maximums ("op til"). Not on BattMan's list of projects being built.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B052.