Vitreous LabsEnergy transparency

Pyhäjoki (Enlight, from Usva Energia)

Announced, 100 MW · 400 MWh, in Pyhäjoki, owned by Enlight Renewable Energy Ltd. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power100 MW
Capacity400 MWh
Duration4.0 hours
StatusAnnounced, as of 5 October 2026
MunicipalityPyhäjoki
Grid connectionElenia 110 kV distribution grid (planned)
Placed on the mapat the centre of Pyhäjoki, its municipality (GeoNames)

Who is behind it

OwnerEnlight Renewable Energy Ltd
DeveloperUsva Energia

Enlight (Israel). YTJ lists Enlight Energy Storage Aurora Oy (3561777-2, former name Usva Energy Storage Aurora Oy); the name does not say Pyhäjoki, so it is not assigned.

Not published anywhere we have found: ultimate owner, built by, cells. The page says so rather than guessing.

What the sources say

Usva (5 Oct 2026): sale closed; ready to build since July 2026; Usva's third ready-to-build sale of 2026 (the second is not named).

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B044.

All batteries  ·  On the map