Vitreous LabsEnergy transparency
The Netherlands · the named batteries

Sequoia

Investment decided, not yet being built, 200 MW · 800 MWh, in Oosterhout, owned by Vopak (79%) / Green Energy Storage. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power200 MW
Capacity800 MWh
Duration4.0 hours
StatusInvestment decided, not yet being built, as of 20 October 2026
Stated date2028, H1 2028 (Vopak); GES earlier said 2027
MunicipalityOosterhout, Noord-Brabant
Grid connectionTenneT HV; TDTR plus capacity-control 'congestion mitigator' contract
Placed on the mapat the site itself, as mapped on OpenStreetMap (Sequoia)
How sureA dated source confirms it

Who is behind it

OwnerVopak (79%) / Green Energy Storage

Not published anywhere we have found: traded by, built by.

What the sources say

FID 2 July 2026, Vopak EUR 230m. Vopak's own release was not read.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B35.