Being built, 200 MW · 800 MWh, in Winschoten, owned by Return. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power200 MW
Capacity800 MWh
Duration4.0 hours
StatusBeing built, as of 20 October 2026
Stated date2027, Q4 2027
MunicipalityWinschoten, Oldambt, Groningen
Grid connectionTenneT, time-dependent transport right; TenneT Meeden
Placed on the mapat Winschoten, the place its source names (GeoNames)
How sureA dated source confirms it

Who is behind it

OwnerReturn
Traded byVattenfall (long-term fixed-price toll)
Built byHuawei (batteries); Hanab and Omexom (construction consortium)

What the sources say

Location conflict: trade press says Winschoten, Return says Meeden (the substation). Return's own page labels it under construction, but no dated source confirms construction work. Investment about EUR 180m.; Financial close confirmed 1 September 2026. Return's live page (read 20 October 2026) says Under Construction but is undated. Return’s locations page lists it as being built.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B33.

All batteries  ·  On the map