Vitreous LabsEnergy transparency

Boden (Polar Structure)

No word since its date, 50 MW · 100 MWh, in Boden (SE1), owned by Polar Structure. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power50 MW
Capacity100 MWh
Duration2.0 hours
StatusNo word since its date, as of 26 March 2024
Owner’s date2024, expected
MunicipalityBoden
Bidding zoneSE1, Luleå
Placed on the mapat Boden, the seat of its municipality (GeoNames)

Who is behind it

OwnerPolar Structure

Not published anywhere we have found: ultimate owner, developer, traded by, built by, cells.

What the sources say

Announced in March 2024 beside Stegra in Boden Industrial Park. No word since that it was built.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B047.

All batteries  ·  On the map